WELL · 42-233-33003 · DISTRICT 10
Coble Shire 64 #2
Hutchinson County · Shire (Granite Wash) field · Vertical
Coble Shire 64 #2 (API 42-233-33003) is a plugged well in Hutchinson County, plugged December 21, 2017, last operated by Tom Coble Oil & Gas LP.
The RRC has issued one drilling permit, issued July 30, 2004, permitted to 10,000 ft.
It was permitted by Burnett Oil CO., Inc. and has since transferred to Tom Coble Oil & Gas LP on the wellbore schedule.
Completion filings report 4 formation tops, including Brown Dolomite, Tonkawa, Granite Wash, 13 Finger.
Operator of record
Permitted by Burnett Oil Co., Inc.; the EWA schedule now lists a different operator.
Amarillo, TX · P-5 Y, filed Jun 2, 2023 · 1 permits on file · (620) 629-3596
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tom Coble Oil & Gas LP |
| Production reports | Hadaway Consult and Engineer,llcthrough Jul 2011 |
| Latest permit | Burnett Oil Co., Inc.Jul 30, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,000
- total depth, ft
- 1
- permits on file
- Jul 30, 2004
- last permit issued
- Sep 15, 2004
- completed
- 0
- cumulative oil, bbl
- 413K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2004 THROUGH Jul 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 15, 2004
- Shut in
- —
- Plugged
- Dec 21, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Coble Shire 64 G-14-208974 | Shire (Granite Wash) | Tom Coble Oil & Gas LP | 1 | 0 | 413K | Sep 2004 – Jul 2024 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Burnett Oil Co., Inc.Oct 2004 → Jun 2005
- 2Latigo Petroleum Texas, LPJul 2005 → Dec 2008
- 3Latigo Petroleum, Inc.Mar 2009 → Apr 2011
- 4Hadaway Consult and Engineer,llcMay 2011 → Jul 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 548949-99 | Drill | Burnett Oil Co., Inc. | Jul 30, 2004 | Jul 30, 2004 | Aug 18, 2004 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-208974 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,668 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 3,100 | -432 |
| Tonkawa | 5,270 | -2,602 |
| Granite Wash | 6,265 | -3,597 |
| 13 Finger | 6,790 | -4,122 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,638 | 6,654 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,558 | 12.25 | 626 S |
| 5.5 | 6,985 | 7.875 | 195 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 26, 2005 | Feb 7, 2005 | Yes |
| 00 | Jun 30, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-233-33003 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-233-33003 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23333003, documented in the API reference.