WELL · 42-233-33070 · DISTRICT 10
Klyne #1
Hutchinson County · Panhandle West field · Producing · Vertical
Klyne #1 (API 42-233-33070) is a well in Hutchinson County operated by Large Operating LLC, completed February 9, 2007 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued March 29, 2006, permitted to 3,200 ft.
It was permitted by Rimrock Gas Company and has since transferred to Large Operating LLC on the wellbore schedule.
Completion filings report one formation top, including Brown Dolomite.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Rimrock Gas Company; the EWA schedule now lists a different operator.
Stinnett, TX · P-5 Y, filed Sep 4, 2025 · 2 permits on file · (806) 681-5952
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Large Operating LLC |
| Production reports | Large Operating LLCthrough Apr 2026 |
| Latest permit | Rimrock Gas CompanyMar 29, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,200
- total depth, ft
- 1
- permits on file
- Mar 29, 2006
- last permit issued
- Feb 9, 2007
- completed
- 0
- cumulative oil, bbl
- 118K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 9, 2007
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Klyne G-14-224860 | Panhandle, West | Large Operating LLC | 1 | 0 | 118K | Feb 2007 – Jul 2026 |
Gas, mcf lease total
Last 12 months 2,205 · prior 12 2,864(-23%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1SNW Operating CompanyFeb 2007 → Sep 2014
- 2PG-M International Operating,llcOct 2014 → May 2019
- 3Bar L ProducersSep 2019 → Aug 2022
- 4Large Operating LLCSep 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 616522-99 | Drill | Rimrock Gas Company | Mar 27, 2006 | Mar 29, 2006 | Nov 11, 2006 | 3,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-224860 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,036 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 2,325 | 711 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,321 | 2,644 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 321 | 13.5 | 210 S |
| 7 | 2,321 | 8.75 | 90 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 16, 2007 | Feb 16, 2007 | Yes |
| 00 | Feb 27, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-233-33070 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-233-33070 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23333070, documented in the API reference.