WELL · 42-235-33102 · DISTRICT 7

Rock Pen Clearfork Unit #2115

N

Irion County · Rock Pen (Clearfork) field  · Vertical

Rock Pen Clearfork Unit #2115 (API 42-235-33102) is a well in Irion County operated by Armor Petroleum Inc., completed September 9, 1992.

The RRC has issued one drilling permit, issued August 18, 1992, permitted to 3,800 ft.

It was permitted by Siete Oil And Gas Corporation and has since transferred to Armor Petroleum Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including San Angelo, Clear Fork.

Its 2 leases have reported 929K barrels of oil and 13.7K mcf of gas since January 1993, last reporting in July 2026. The leases carry 32 wells, so these are lease totals, not this well alone.

Operator of record

Armor Petroleum Inc.

Permitted by Siete Oil and Gas Corporation; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Sep 8, 2023 · 43 permits on file · (940) 733-4335

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleArmor Petroleum Inc.
Production reportsCore Petro, LLCthrough Feb 2026
Latest permitSiete Oil and Gas CorporationAug 18, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,800
total depth, ft
1
permits on file
Aug 18, 1992
last permit issued
Sep 9, 1992
completed
929K
cumulative oil, bbl
13.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 9, 1992
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 32 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Farmar-Sugg 21 O-9-21288Rock Pen (Clearfork)Core Petro, LLC42.73K0Apr 2021 – Jul 2026
Rock Pen Clearfork Unit O-9-13010Rock Pen (Clearfork)Armor Petroleum, Inc.28927K13.7KJan 1993 – Jul 2021

Oil, barrels lease total

Last 12 months 105 · prior 12 865(-88%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Siete Oil and Gas CorporationJan 1993 → Jun 1996
  2. 2St. Mary Land & Expl. Co. -CMCJul 1996 → Jun 1997
  3. 3St. Mary Land & Exploration Co.Jul 1997 → May 2000
  4. 4Armor Petroleum, Inc.Jun 2000 → May 2021
  5. 5Core Petro, LLCJun 2021 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
400882-99DrillSiete Oil and Gas CorporationJul 6, 1992Aug 18, 1992Aug 22, 19923,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-13010————
—— O-9-21288————

Formation tops

As filed on W-2/G-1. Subsea from 2,381 ft elevation.Download CSV →

FormationMD ftSubsea
San Angelo1,585796
Clear ForkCLEARFORK3,462-1,081

Perforations

Perforated and open-hole intervals.

FromToType
3,4643,482Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62543311275 S
5.53,6017.875790 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 24, 2021Sep 21, 1992Yes
00Oct 8, 1992Sep 21, 1992Yes
00Sep 28, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23533102, documented in the API reference.