WELL · 42-237-04040 · DISTRICT 9

Riley L. L. #2

N

Jack County · Rusmag (Janey Sand) field  · Vertical

Riley L. L. #2 (API 42-237-04040) is a well in Jack County operated by Maguire Oil Company, completed August 6, 1988.

The RRC has issued 2 drilling permits between 1988 and 1991, permitted to 5,500 ft.

Completion filings report 7 formation tops, including Caddo, Top Of Ken Sand, Smith Sand, Gc Sand.

No lease production has been reported under this well’s leases.

Operator of record

Maguire Oil Company

Dallas, TX · P-5 Y, filed Apr 3, 2009 · 274 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMaguire Oil Company
Production reportsCentury Petroleum, Inc.through Apr 2026
Latest permitMaguire Oil CompanySep 16, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,500
total depth, ft
2
permits on file
Sep 16, 1991
last permit issued
Aug 6, 1988
completed
0
cumulative oil, bbl
258K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 6, 1988
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Riley, L. L. G-13-139599Rusmag (GC Sand)Century Petroleum, Inc.10258KJan 1993 – Jul 2026
— G-13-128010——000—

Gas, mcf lease total

Last 12 months 3,602 · prior 12 3,652(-1%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maguire Oil CompanyJan 1993 → Aug 2004
  2. 23-R Production, Inc.Sep 2004 → Oct 2004
  3. 3EOG Resources, Inc.Nov 2004 → Feb 2010
  4. 4Century Petroleum, Inc.Mar 2010 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
391911-99RecompletionMaguire Oil CompanySep 16, 1991Sep 16, 1991Sep 16, 19915,258
348500-99RecompletionMaguire Oil CompanyJul 5, 1988Jul 7, 1988—5,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-128010————
—— G-13-139599————

Formation tops

As filed on W-2/G-1. Subsea from 1,057 ft elevation.Download CSV →

FormationMD ftSubsea
CaddoBASE CADDO LIME4,422-3,365
CaddoTOP OF CADDO LIME4,440-3,383
Top of Ken Sand4,719-3,662
Smith Sand4,822-3,765
GC Sand5,054-3,997
Top of GC Sand5,070-4,013
Top of Janey Sand5,276-4,219
Base of Janey Sand5,294-4,237

Perforations

Perforated and open-hole intervals.

FromToType
5,0545,079Perforated
5,2785,290Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7512013.75—
74,4538.75—
4.55,3446.125165 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 15, 1991Sep 26, 1991Yes
00Oct 29, 1991——
00Sep 13, 1988Aug 10, 1988Yes
00Aug 30, 1988——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

193K
bbl, last 12 reported months
193K
bbl, all reported
Oct 1983
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000033834UIC PermitCanceled Sep 24, 19864007804,453–4,476

MONTHLY INJECTED, BBL · H-10 · LAST 10 REPORTED MONTHS

Last 12 months 193,190

010K20K30K1983

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23704040, documented in the API reference.