WELL · 42-237-04052 · DISTRICT 9
Riley P. H. A #2
Jack County · Rusmag (Janey Sand) field · Vertical
Riley P. H. A #2 (API 42-237-04052) is a plugged well in Jack County, plugged February 21, 2001, last operated by Maguire Oil Company.
The RRC has issued 2 drilling permits between 1989 and 1995, permitted to 5,450 ft.
Completion filings report 8 formation tops, including Ken Sand, Smith Sand, Base Of Smith Sand, Smith Sand (Base).
Operator of record
Dallas, TX · P-5 Y, filed Apr 3, 2009 · 274 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Maguire Oil Company |
| Production reports | Maguire Oil Companythrough Nov 1996 |
| Latest permit | Maguire Oil CompanyFeb 14, 1995 |
- 5,450
- total depth, ft
- 2
- permits on file
- Feb 14, 1995
- last permit issued
- Jan 28, 1989
- completed
- 0
- cumulative oil, bbl
- 31.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 28, 1989
- Shut in
- —
- Plugged
- Feb 21, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Riley, P. H. "A" G-13-152851 | Rusmag (GC Sand) | Maguire Oil Company | 1 | 0 | 23.5K | Feb 1995 – Feb 2001 |
| Riley, P. H. "A" G-13-129776 | Rusmag (Janey Sand) | Maguire Oil Company | 1 | 0 | 8.21K | Jan 1993 – Feb 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Maguire Oil CompanyJan 1993 → Nov 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 432919-99 | Recompletion | Maguire Oil Company | Feb 14, 1995 | Feb 14, 1995 | Dec 28, 1994 | 5,245 |
| 355331-99 | Recompletion | Maguire Oil Company | Jan 19, 1989 | Jan 19, 1989 | — | 5,450 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-129776 | — | — | — | — |
| — | — G-13-152851 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,048 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Ken Sand | 4,696 | -3,648 |
| Smith Sand | 4,804 | -3,756 |
| Base of Smith Sand | 4,826 | -3,778 |
| Smith Sand (Base) | 4,826 | -3,778 |
| GC Sand | 5,038 | -3,990 |
| GC Sand (Base) | 5,074 | -4,026 |
| Melinda Sand | 5,232 | -4,184 |
| Janey Sand | 5,261 | -4,213 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,038 | 5,044 | Perforated |
| 5,102 | 5,109 | Perforated |
| 5,222 | 5,226 | Perforated |
| 5,262 | 5,270 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 120 | 13.375 | — |
| 5.5 | 4,435 | 8.75 | — |
| 2.875 | 5,395 | 4.75 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 23, 1995 | Feb 15, 1995 | Yes |
| 00 | Feb 28, 1995 | — | — |
| 00 | Jun 15, 1989 | Feb 8, 1989 | Yes |
| 00 | Apr 6, 1989 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-04052 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-04052 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23704052, documented in the API reference.