WELL · 42-237-05690 · DISTRICT 9

Casteel #2

Y

Jack County · Jack County Regular field · Injection  · Vertical

Casteel #2 (API 42-237-05690) is a well in Jack County operated by D L Operating, completed October 12, 2015 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued May 31, 2011, permitted to 3,500 ft.

It was permitted by Arrowhead Productions, LP and has since transferred to D L Operating on the wellbore schedule.

Completion filings report 2 formation tops, including Sandy Shale, Limey Sand.

Its lease has reported 13.1K barrels of oil since August 2011, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 22.3K barrels injected in the 12 months reported through October 2025.

Operator of record

D L Operating

Permitted by Arrowhead Productions, LP; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Mar 4, 2026 · 11 permits on file · (940) 507-0661

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleD L Operating
Production reportsD L Operatingthrough Apr 2026
Latest permitArrowhead Productions, LPMay 31, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,500
total depth, ft
1
permits on file
May 31, 2011
last permit issued
Oct 12, 2015
completed
13.1K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 12, 2015
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Casteel O-13-32167Jack County RegularD L Operating213.1K0Aug 2011 – Jul 2026

Oil, barrels lease total

Last 12 months 464 · prior 12 530(-12%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arrowhead Productions, LPAug 2011 → Jun 2015
  2. 2D L OperatingJul 2015 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
717159-99ReenterArrowhead Productions, LPMay 25, 2011May 31, 2011Jun 7, 20113,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-32167————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Sandy Shale3,187
Limey Sand3,217

Perforations

Perforated and open-hole intervals.

FromToType
3,1963,208Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62552112.25305 S
5.53,4247.875355 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 17, 2016Nov 30, 2015—
00Oct 3, 2012Oct 24, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

22.3K
bbl, last 12 reported months
306K
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000109712H-1 InjectionActive2,0001,5953,196–3,208

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 22,257 · prior 12 22,012(+1%)

01K2K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.