WELL · 42-237-30318 · DISTRICT 9

Barker A.C. #1

Plugged

Jack County · Jack County Regular field  · Vertical

Barker A.C. #1 (API 42-237-30318) is a plugged well in Jack County, plugged November 13, 2013, last operated by B & B Enterprises.

The RRC has issued one drilling permit, issued December 30, 1981, permitted to 3,200 ft.

Operator of record

B & B Enterprises

Graham, TX · P-5 Y, filed Oct 2, 2015 · 4 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleB & B Enterprises
Production reportsnone
Latest permitB & B EnterprisesDec 30, 1981
3,200
total depth, ft
1
permits on file
Dec 30, 1981
last permit issued
Jan 5, 1982
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 5, 1982
Shut in
—
Plugged
Nov 13, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Barker, A.C. O-13-21821Jack County RegularB & B Enterprises100Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
145972-99OtherB & B EnterprisesDec 30, 1981Dec 30, 1981—3,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-21821————

Perforations

Perforated and open-hole intervals.

FromToType
2,7082,798Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62537412.25230 S
4.53,0327.875660 S
2.8753,032——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jan 13, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
6.42M
bbl, all reported
Oct 2010
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000042751W-14 DisposalPlugged Nov 25, 20134,5001,0002,706–2,798

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120092010

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23730318, documented in the API reference.