WELL · 42-237-30624 · DISTRICT 13
Gaskin, John #1 D
Jack County · Vertical
Gaskin, John #1 D (API 42-237-30624) is a plugged well in Jack County, plugged December 22, 2000, last operated by Cromera Oil & Gas CO..
The RRC has issued one drilling permit, issued March 4, 1982, permitted to 4,700 ft.
Operator of record
Ruidoso, NM · P-5 Y, filed Jan 15, 1986 · 40 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Cromera Oil & Gas Co.Mar 4, 1982 |
- 4,700
- total depth, ft
- 1
- permits on file
- Mar 4, 1982
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Dec 22, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 152290-99 | Other | Cromera Oil & Gas Co. | Mar 4, 1982 | Mar 4, 1982 | — | 4,700 |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-30624 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-30624 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000088714 | W-14 Disposal | Canceled Sep 11, 1987 | 250 | 400 | 1,910–1,980 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23730624, documented in the API reference.