WELL · 42-237-30829 · DISTRICT 9
Sewell, D R #2
Jack County · Vertical
Sewell, D R #2 (API 42-237-30829) is a plugged well in Jack County, plugged January 18, 2023, last operated by Shale Tank Truck LP.
The RRC has issued 2 drilling permits between 1980 and 2004, permitted to 5,600 ft.
Completion filings report one formation top, including Strawn.
Operator of record
Gainesville, TX · P-5 Y, filed Jun 8, 2012 · 17 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Ranger Operating Co.through May 2001 |
| Latest permit | Shale Tank Truck LPNov 29, 2004 |
- 5,600
- total depth, ft
- 2
- permits on file
- Nov 29, 2004
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 30.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jan 18, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sewell, D R O-13-30420 | Jack County Regular | Complete Energy Services, Inc. | 1 | 0 | 0 | Apr 2005 – Aug 2023 |
| Sewell, D. R. G-13-65351 | Jack County Regular (Gas) | Ranger Operating Co. | 1 | 0 | 30.7K | Jan 1993 – Dec 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Ranger Operating Co.Jan 1993 → May 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 554060-99 | Reenter | Shale Tank Truck LP | Nov 23, 2004 | Nov 29, 2004 | Mar 23, 2005 | 3,000 |
| 69884-99 | Drill | Ranger Operating Co. | Jan 16, 1980 | Jan 16, 1980 | Mar 22, 1975 | 5,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-65351 | — | — | — | — |
| — | — O-13-30420 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,111 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| StrawnSTRAWN SANDS | 1,830 | -719 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,234 | 2,620 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 255 | 12.25 | 190 S |
| 5.5 | 3,005 | 7.875 | 475 S |
| 5.5 | 5,364 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 5, 2005 | Apr 13, 2005 | Yes |
| 00 | Apr 21, 2005 | — | — |
| 00 | Jan 12, 1984 | Feb 24, 1976 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-30829 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-30829 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 6.45M
- bbl, all reported
- Oct 2023
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000094944 | W-14 Disposal | Plugged Aug 14, 2023 | 5,000 | 1,117 | 2,234–2,620 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23730829, documented in the API reference.