WELL · 42-237-32396 · DISTRICT 9
Halsell Brothers #1
Jack County · Arco (Conglomerate) field · Vertical
Halsell Brothers #1 (API 42-237-32396) is a plugged well in Jack County, plugged January 15, 2014, last operated by Brigadier Operating LLC.
The RRC has issued one drilling permit, issued October 6, 1978, permitted to 4,700 ft.
It was permitted by Cromera Oil & Gas CO. and has since transferred to Brigadier Operating LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Big Saline, Marble Falls.
Operator of record
Permitted by Cromera Oil & Gas Co.; the EWA schedule now lists a different operator.
Plano, TX · P-5 Y, filed Aug 3, 2018 · 212 permits on file · (214) 763-0695
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Brigadier Operating LLC |
| Production reports | Borderline Operating Corp.through Aug 2011 |
| Latest permit | Cromera Oil & Gas Co.Oct 6, 1978 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,700
- total depth, ft
- 1
- permits on file
- Oct 6, 1978
- last permit issued
- Oct 28, 1978
- completed
- 0
- cumulative oil, bbl
- 711K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 28, 1978
- Shut in
- —
- Plugged
- Jan 15, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Halsell Brothers G-13-80518 | Arco (Conglomerate) | Brigadier Operating, LLC | 1 | 0 | 711K | Jan 1993 – Jan 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mitchell Energy CorporationJan 1993 → Nov 1998
- 2Borderline ProductionDec 1998 → Feb 2000
- 3Borderline Operating Corp.Mar 2000 → Aug 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 34251-99 | Drill | Cromera Oil & Gas Co. | Oct 6, 1978 | Oct 6, 1978 | — | 4,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-80518 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,616 | 4,634 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 262 | 13.375 | 180 S |
| 4.2 | 4,694 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 10, 2011 | May 23, 2011 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-32396 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-32396 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Oct 2013
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000102668 | H-1 Injection | Plugged Mar 14, 2014 | 5,000 | 2,300 | 4,616–4,634 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23732396, documented in the API reference.