WELL · 42-237-32525 · DISTRICT 9

Craft E. M. #134 #1

N

Jack County · Jack County Regular field  · Vertical

Craft E. M. #134 #1 (API 42-237-32525) is a well in Jack County operated by Sanders Oil & Gas Incorporated, completed April 30, 1979.

The RRC has issued one drilling permit, issued February 9, 1979, permitted to 5,300 ft.

It was permitted by Sanders Oil & Gas CO. and has since transferred to Sanders Oil & Gas Incorporated on the wellbore schedule.

Completion filings report 2 formation tops, including Pregnant Shale, Conglomerate.

No lease production has been reported under this well’s leases.

Operator of record

Sanders Oil & Gas Incorporated

Permitted by Sanders Oil & Gas Co.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jul 2, 1999 · 18 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSanders Oil & Gas Incorporated
Production reportsSanco Operating Companythrough Feb 2002
Latest permitSanders Oil & Gas Co.Feb 9, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,300
total depth, ft
1
permits on file
Feb 9, 1979
last permit issued
Apr 30, 1979
completed
0
cumulative oil, bbl
51.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 30, 1979
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Craft, E. M. #134 G-13-126984Jack County RegularEagleridge Operating, LLC1051.2KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1SancoJan 1993 → Mar 2000
  2. 2Sanco Operating CompanyApr 2000 → Feb 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
42329-99DrillSanders Oil & Gas Co.Feb 9, 1979Feb 9, 1979—5,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-126984————

Formation tops

As filed on W-2/G-1. Subsea from 1,243 ft elevation.Download CSV →

FormationMD ftSubsea
Pregnant Shale4,280-3,037
Conglomerate4,504-3,261

Perforations

Perforated and open-hole intervals.

FromToType
4,5134,522Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62522012.75150 S
2.3754,446——
4.54,7897.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 7, 1988Mar 4, 1988—
00May 11, 1988——
00Jan 12, 1984Jul 28, 1980—
00Jan 12, 1984Jun 19, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23732525, documented in the API reference.