WELL · 42-237-32527 · DISTRICT 9
Sartain-Mason #1
Jack County · Perrin East (Congl. 5400) field · Vertical
Sartain-Mason #1 (API 42-237-32527) is a well in Jack County operated by Jjb Operating CO., completed December 10, 1979.
The RRC has issued 2 drilling permits between 1979 and 1994, permitted to 5,900 ft.
No lease production has been reported under this well’s leases.
Operator of record
Mineral Wells, TX · P-5 Y, filed May 7, 2004 · 2 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | JJB Operating Co. |
| Production reports | RKW Operating LLCthrough Jun 2024 |
| Latest permit | JJB Operating Co.Nov 15, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,900
- total depth, ft
- 2
- permits on file
- Nov 15, 1994
- last permit issued
- Dec 10, 1979
- completed
- 0
- cumulative oil, bbl
- 47K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 10, 1979
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sartain-Mason G-13-153332 | Jack County Regular (Gas) | RKW Operating LLC | 1 | 0 | 45.6K | Nov 1994 – Jul 2026 |
| Sartain-Mason G-13-85869 | Perrin, East (Congl. 5400) | JJB Operating Co. | 1 | 0 | 1.43K | Jan 1993 – Nov 1994 |
Gas, mcf lease total
Last 12 months 0 · prior 12 16(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Whitehead Prod. Co., Inc.Jan 1993 → Jul 1993
- 2JJB Operating Co.Nov 1994 → Feb 1997
- 3MKS Consulting CorporationMar 1997 → Jul 2005
- 4MKS Natural Gas CompanyAug 2005 → Mar 2016
- 5RKW Operating LLCApr 2016 → Jun 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 430061-99 | Recompletion | JJB Operating Co. | Nov 15, 1994 | Nov 15, 1994 | Nov 9, 1994 | 5,793 |
| 42539-99 | Drill | Whitehead Prod. Co., Inc. | Feb 14, 1979 | Feb 14, 1979 | — | 5,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-85869 | — | — | — | — |
| — | — G-13-153332 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,608 | 3,618 | Perforated |
| 3,632 | 3,634 | Perforated |
| 5,463 | 5,473 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 292 | 12.25 | — |
| 2.375 | 5,500 | — | — |
| 4.5 | 5,800 | 7.875 | — |
| 4.5 | — | 7.875 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 13, 1995 | Mar 14, 1995 | Yes |
| 00 | Mar 24, 1995 | — | — |
| 00 | Jan 12, 1984 | Jan 7, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-32527 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-32527 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23732527, documented in the API reference.