WELL · 42-237-32795 · DISTRICT 9
Street Anna #2
Jack County · Stewart (Congl.) field · Vertical
Street Anna #2 (API 42-237-32795) is a well in Jack County operated by Stephens & Johnson Operating CO., completed July 1, 1984.
The RRC has issued 2 drilling permits between 1979 and 2013, permitted to 5,500 ft.
Completion filings report 5 formation tops, including Strawn, Bryson, Caddo, Conglomerate.
Its 2 leases have reported 489K barrels of oil and 100K mcf of gas since January 1993, last reporting in July 2026. The leases carry 8 wells, so these are lease totals, not this well alone.
Operator of record
Stephens & Johnson Operating Co.
Wichita Falls, TX · P-5 Y, filed May 4, 2026 · 360 permits on file · (940) 781-1977
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Stephens & Johnson Operating Co. |
| Production reports | Stephens & Johnson Operating Co.through Apr 2026 |
| Latest permit | Stephens & Johnson Operating Co.Aug 14, 2013 |
- 5,500
- total depth, ft
- 2
- permits on file
- Aug 14, 2013
- last permit issued
- Jul 1, 1984
- completed
- 489K
- cumulative oil, bbl
- 100K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 1, 1984
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Street, Anna O-13-19986 | Street (Strawn) | Stephens & Johnson Operating Co. | 6 | 457K | 37.3K | Jan 1993 – Jul 2026 |
| Street, Anna O-13-24551 | Stewart (Congl.) | Stephens & Johnson Operating Co. | 2 | 31.8K | 62.8K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 3,508 · prior 12 2,799(+25%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Arch Petroleum Inc.Jan 1993 → May 1999
- 2Hane Operating, Inc.Jun 1999 → Mar 2002
- 3Stephens & Johnson Operating Co.Apr 2002 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 767857-99 | Recompletion | Stephens & Johnson Operating Co. | Aug 7, 2013 | Aug 14, 2013 | Apr 16, 2003 | 5,300 |
| 57742-99 | Drill | Mogul Petroleum Corp. | Sep 11, 1979 | Sep 11, 1979 | — | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-19986 | — | — | — | — |
| — | — O-13-24551 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,070 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawn | 2,700 | -1,630 |
| Bryson | 3,592 | -2,522 |
| Caddo | 4,930 | -3,860 |
| Conglomerate | 5,166 | -4,096 |
| Marble Falls | 5,167 | -4,097 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,698 | 2,704 | Perforated |
| 5,166 | 5,188 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 466 | 12.25 | 345 S |
| 2.375 | 5,149 | — | — |
| 4.5 | 5,294 | 7.25 | 400 S |
| 4.5 | 5,294 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 10, 2013 | Aug 23, 2013 | — |
| 00 | Nov 19, 1984 | Aug 3, 1984 | — |
| 00 | Oct 6, 1984 | — | — |
| 00 | Jan 12, 1984 | Feb 6, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-32795 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-32795 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23732795, documented in the API reference.