WELL · 42-237-33062 · DISTRICT 9

Kimball-Walsh #4

Y

Jack County · Bryson East field · Injection  · Vertical

Kimball-Walsh #4 (API 42-237-33062) is a well in Jack County operated by New Horizon Resources LLC, completed June 25, 1980 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued March 11, 1980, permitted to 3,250 ft.

It was permitted by Henry Hydrocarbon, Inc. and has since transferred to New Horizon Resources LLC on the wellbore schedule.

Its lease has reported 47.7K barrels of oil and 327 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 24K barrels injected in the 12 months reported through October 2025.

Operator of record

New Horizon Resources LLC

Permitted by Henry Hydrocarbon, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Sep 4, 2025 · (888) 377-3529

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNew Horizon Resources LLC
Production reportsNew Horizon Resources LLCthrough Apr 2026
Latest permitHenry Hydrocarbon, Inc.Mar 11, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,250
total depth, ft
1
permits on file
Mar 11, 1980
last permit issued
Jun 25, 1980
completed
47.7K
cumulative oil, bbl
327
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 25, 1980
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kimball-Walsh O-13-19874Bryson, EastNew Horizon Resources LLC347.7K327Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,320 · prior 12 1,231(+7%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Engas CorporationJan 1993 → Feb 2001
  2. 2Borderline Operating Corp.Mar 2001 → Mar 2011
  3. 3Banner Oil & Gas LLCApr 2011 → Sep 2021
  4. 4New Horizon Resources LLCOct 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
74789-99DrillHenry Hydrocarbon, Inc.Mar 11, 1980Mar 11, 1980Apr 25, 19803,250

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-19874————

Perforations

Perforated and open-hole intervals.

FromToType
3,1493,202Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62544812.25350 S
2.3753,140——
4.53,2557.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 3, 1990Aug 21, 1990—
00Jan 12, 1984Oct 3, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

24K
bbl, last 12 reported months
698K
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000076880H-1 InjectionActive2005003,149–3,202

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 23,950 · prior 12 26,616(-10%)

01K2K3K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23733062, documented in the API reference.