WELL · 42-237-33123 · DISTRICT 13

Bolton #6

Plugged

Jack County  · Vertical

Bolton #6 (API 42-237-33123) is a plugged well in Jack County, plugged January 21, 2004, last operated by Herring, Ray.

The RRC has issued 2 drilling permits between 1980 and 1983, permitted to 5,500 ft.

Operator of record

Herring, Ray

Graham, TX · P-5 Y, filed Feb 5, 2016 · 401 permits on file · (940) 550-8988

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitHerring, RaySep 29, 1983
5,500
total depth, ft
2
permits on file
Sep 29, 1983
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 21, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
215489-99DrillHerring, RayAug 31, 1983Sep 29, 1983—5,500
77961-99DrillGuitas Oil Corp.Apr 11, 1980Apr 11, 1980Apr 14, 1980900

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23733123, documented in the API reference.