WELL · 42-237-33721 · DISTRICT 9
Standefer Unit #1
Jack County · Jack County Regular (Gas) field · Vertical
Standefer Unit #1 (API 42-237-33721) is a plugged well in Jack County, plugged July 1, 2022, last operated by Oxenergy Incorporated.
The RRC has issued one drilling permit, issued April 15, 1981, permitted to 4,900 ft.
It was permitted by B. B. C. Oil Operating CO. and has since transferred to Oxenergy Incorporated on the wellbore schedule.
Completion filings report 2 formation tops, including Buttram, Strawn.
Operator of record
Permitted by B. B. C. Oil Operating Co.; the EWA schedule now lists a different operator.
Flower Mound, TX · P-5 Y, filed Dec 4, 2025 · (817) 683-8703
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Oxenergy Incorporated |
| Production reports | King Oil & Gasthrough Mar 2015 |
| Latest permit | B. B. C. Oil Operating Co.Apr 15, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,900
- total depth, ft
- 1
- permits on file
- Apr 15, 1981
- last permit issued
- Jan 11, 2000
- completed
- 0
- cumulative oil, bbl
- 108K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2022
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 11, 2000
- Shut in
- —
- Plugged
- Jul 1, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Standefer Unit G-13-100452 | Jack County Regular (Gas) | Oxenergy Incorporated | 1 | 0 | 108K | Jan 1993 – Jun 2022 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Double Eagle Petroleum CorpJan 2000 → Mar 2007
- 2Ipt Oil CompanyJun 2004 → Dec 2004
- 3Uhc Petroleum CorporationJan 2005 → Dec 2005
- 4King Oil & GasApr 2010 → Mar 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 115275-99 | Drill | B. B. C. Oil Operating Co. | Apr 15, 1981 | Apr 15, 1981 | Apr 19, 1981 | 4,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-100452 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,137 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Buttram | 1,950 | -813 |
| Strawn | 3,690 | -2,553 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,070 | 3,148 | Perforated |
| 3,668 | 3,678 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 213 | 12.25 | 145 S |
| 2.375 | 3,690 | — | — |
| 4.5 | 4,710 | 7.875 | 120 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 15, 2000 | Jan 24, 2000 | — |
| 00 | Jan 12, 1984 | Jun 2, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-33721 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-33721 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23733721, documented in the API reference.