WELL · 42-237-33757 · DISTRICT 9
Eatherly #5
Jack County · Vertical
Eatherly #5 (API 42-237-33757) is a disposal or injection well in Jack County operated by Stamper Operating CO., Inc. under an active UIC permit.
The RRC has issued 3 drilling permits between 1981 and 2014, permitted to 5,001 ft.
Completion filings report 3 formation tops, including Caddo, Strawn, Conglomerate.
It holds an active disposal or injection permit, with 1.23K barrels injected in the 12 months reported through October 2025.
Operator of record
Jacksboro, TX · P-5 Y, filed Oct 4, 2025 · 102 permits on file · (940) 781-0078
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Stamper Operating Co., Inc.through Mar 1996 |
| Latest permit | Stamper Operating Co., Inc.Sep 11, 2014 |
- 5,001
- total depth, ft
- 3
- permits on file
- Sep 11, 2014
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 13.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Eatherly O-13-34111 | Strahan (Congl) | Rio Bravo Production, LLC | 1 | 0 | 0 | Feb 2021 – Jul 2026 |
| Eatherly G-13-102134 | Strahan (Congl) | Stamper Operating Co., Inc. | 1 | 0 | 13.5K | Jan 1993 – Jan 2011 |
| — O-13-22557 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Stamper Operating Co., Inc.Jan 1993 → Mar 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 794698-99 | Reenter | Stamper Operating Co., Inc. | Aug 22, 2014 | Sep 11, 2014 | Oct 5, 1981 | 5,001 |
| 117998-99 | Drill | Golden Petroleum Corp | May 13, 1981 | May 13, 1981 | Oct 5, 1981 | 5,000 |
| 117997-99 | Drill | Golden Petroleum Corp | May 13, 1981 | May 13, 1981 | — | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-102134 | — | — | — | — |
| — | — O-13-22557 | — | — | — | — |
| — | — O-13-34111 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,196 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,438 | 4,444 | Perforated |
| — | 4,444 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 376 | 12.25 | 300 S |
| 2.375 | 4,391 | — | — |
| 4.5 | 4,999 | 7.875 | 165 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 22, 2022 | Jun 17, 2022 | — |
| 00 | Apr 15, 1998 | Dec 30, 1997 | — |
| 00 | Jan 9, 1992 | Oct 18, 1982 | — |
| 00 | Jan 12, 1984 | Oct 18, 1982 | — |
| 00 | Jan 12, 1984 | Apr 14, 1982 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-33757 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-33757 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 1.23K
- bbl, last 12 reported months
- 56.8K
- bbl, all reported
- Oct 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000084973 | H-1 Injection | Plugged Jan 27, 2011 | 80 | 600 | 4,438–4,444 |
| 000111465 | H-1 Injection | Active | 500 | 2,219 | 4,438–4,444 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 1,233 · prior 12 1,065(+16%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23733757, documented in the API reference.