WELL · 42-237-34089 · DISTRICT 9
Padgett W. O. #2
Jack County · Lewtex Caddo (Congl) field · Vertical
Padgett W. O. #2 (API 42-237-34089) is a well in Jack County operated by Brightman Family Trust, completed November 29, 1981.
The RRC has issued 2 drilling permits between 1981 and 1983, permitted to 5,000 ft.
Completion filings report one formation top, including Caddo.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit.
Operator of record
Graham, TX · P-5 Y, filed Nov 6, 2009 · 2 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Brightman Family Trust |
| Production reports | none |
| Latest permit | Brightman Family TrustJun 28, 1983 |
- 5,000
- total depth, ft
- 2
- permits on file
- Jun 28, 1983
- last permit issued
- Nov 29, 1981
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 29, 1981
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Padgett, W. O. O-13-26274 | Jermyn, West (Caddo-MF) | Kramer Operating, LLC | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 199792-99 | Recompletion | Brightman Family Trust | Jun 28, 1983 | Jun 28, 1983 | — | 4,861 |
| 136594-99 | Drill | Brightman Family Trust | Sep 24, 1981 | Sep 24, 1981 | Oct 2, 1981 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-26274 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,343 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,575 | 4,584 | Perforated |
| 4,575 | 4,590 | Perforated |
| 4,734 | 4,861 | Perforated |
| 4,734 | 4,861 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 550 | 12.25 | 400 S |
| 2.375 | 4,550 | — | — |
| 2.375 | 4,725 | — | — |
| 4.5 | 4,734 | 7.875 | 100 S |
| 4.5 | 4,736 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 27, 1993 | Aug 2, 1993 | Yes |
| 00 | Mar 14, 1988 | Feb 22, 1988 | — |
| 00 | Jan 18, 1988 | Sep 22, 1987 | — |
| 00 | Nov 14, 1987 | — | — |
| 00 | Aug 5, 1986 | Jul 21, 1986 | — |
| 00 | Jul 31, 1986 | — | — |
| 00 | Jan 12, 1984 | Mar 15, 1983 | — |
| 00 | Jan 12, 1984 | Dec 16, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-34089 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-34089 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 489K
- bbl, all reported
- Nov 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000079216 | H-1 Injection | Active | 100 | 1,680 | 3,368–3,444 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23734089, documented in the API reference.