WELL · 42-237-34222 · DISTRICT 9
Graham #4 #4
Jack County · Sewell (Caddo Lower) field · Vertical
Graham #4 #4 (API 42-237-34222) is a plugged well in Jack County, plugged October 27, 2004, last operated by Schlittler Willard.
The RRC has issued 2 drilling permits between 1981 and 1982, permitted to 4,999 ft.
It was permitted by Horn, J.R.,Operator and has since transferred to Schlittler Willard on the wellbore schedule.
Operator of record
Permitted by Horn, J.r.,operator; the EWA schedule now lists a different operator.
Bryson, TX · P-5 Y, filed Jul 4, 2026 · 1 permits on file · (940) 550-8292
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Schlittler Willard |
| Production reports | none |
| Latest permit | Horn, J.r.,operatorOct 28, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,999
- total depth, ft
- 2
- permits on file
- Oct 28, 1982
- last permit issued
- Jul 15, 1983
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 15, 1983
- Shut in
- —
- Plugged
- Oct 27, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Graham #4 O-13-21371 | Sewell (Caddo Lower) | Schlittler, Willard | 1 | 0 | 0 | Jan 1993 – Mar 2008 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 175757-99 | Recompletion | Horn, J.r.,operator | Oct 28, 1982 | Oct 28, 1982 | — | 4,445 |
| 142785-99 | Drill | Horn, J.r.,operator | Dec 4, 1981 | Dec 4, 1981 | — | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-21371 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,684 | 3,694 | Perforated |
| 4,020 | 4,030 | Perforated |
| 4,425 | 4,450 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 250 | 12.25 | 350 S |
| 2.375 | 4,050 | — | — |
| 2.875 | 4,425 | — | — |
| 4.5 | 4,450 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 27, 1993 | Sep 24, 1993 | — |
| 00 | Dec 20, 1984 | Nov 26, 1984 | — |
| 00 | Dec 19, 1984 | Nov 26, 1984 | — |
| 00 | Jan 12, 1984 | Dec 22, 1982 | — |
| 00 | Jan 12, 1984 | Jun 18, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-34222 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-34222 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 272K
- bbl, all reported
- Oct 2004
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000048471 | H-1 Injection | Plugged Dec 31, 2004 | 0 | 0 | 0–0 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23734222, documented in the API reference.