WELL · 42-237-34490 · DISTRICT 9

Henderson #1

Plugged

Jack County · Jax (Congl.) field  · Vertical

Henderson #1 (API 42-237-34490) is a plugged well in Jack County, plugged October 6, 1983, last operated by Western Chief Oil & Gas Company.

The RRC has issued one drilling permit, issued May 20, 1982, permitted to 5,500 ft.

Completion filings report one formation top, including Congl.

Operator of record

Western Chief Oil & Gas Company

Graham, TX · P-5 Y, filed Sep 5, 2008 · 339 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWestern Chief Oil & Gas Company
Production reportsnone
Latest permitWestern Chief Oil & Gas CompanyMay 20, 1982
5,500
total depth, ft
1
permits on file
May 20, 1982
last permit issued
Aug 30, 1982
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 30, 1982
Shut in
—
Plugged
Oct 6, 1983

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
161314-99DrillWestern Chief Oil & Gas CompanyMay 20, 1982May 20, 1982—5,500

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Congl5,150

Perforations

Perforated and open-hole intervals.

FromToType
5,1305,138Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62530012.25210 S
2.3755,136——
4.55,1447.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Dec 6, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23734490, documented in the API reference.