WELL · 42-237-34750 · DISTRICT 13
Barker, C. J. #1
Jack County · Vertical
Barker, C. J. #1 (API 42-237-34750) is a plugged well in Jack County, plugged August 28, 1986, last operated by Cook Production CO..
The RRC has issued one drilling permit, issued September 23, 1982, permitted to 5,573 ft.
Operator of record
Fort Worth, TX · P-5 Y, filed Jan 13, 1987 · 31 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Cook Production Co.Sep 23, 1982 |
- 5,573
- total depth, ft
- 1
- permits on file
- Sep 23, 1982
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Aug 28, 1986
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 172967-99 | Drill | Cook Production Co. | Sep 23, 1982 | Sep 23, 1982 | Sep 28, 1982 | 5,573 |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-34750 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-34750 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000102351 | UIC Permit | Plugged Sep 8, 1986 | 1,500 | 900 | 1,812–2,302 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23734750, documented in the API reference.