WELL · 42-237-34799 · DISTRICT 9

Owen #1

Plugged

Jack County · L.W.T. (Congl.) field  · Vertical

Owen #1 (API 42-237-34799) is a plugged well in Jack County, plugged October 30, 2020, last operated by Jdl Operating LLC.

The RRC has issued one drilling permit, issued October 13, 1982, permitted to 5,200 ft.

It was permitted by Ropar Operating CO. and has since transferred to Jdl Operating LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Caddo, Marble Falls.

Its 2 leases have reported 17K barrels of oil and 60.8K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

JDL Operating LLC

Permitted by Ropar Operating Co.; the EWA schedule now lists a different operator.

Holliday, TX · P-5 Y, filed Nov 4, 2025 · 48 permits on file · (940) 691-1344

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJDL Operating LLC
Production reportsJDL Operating, LLCthrough Apr 2026
Latest permitRopar Operating Co.Oct 13, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,200
total depth, ft
1
permits on file
Oct 13, 1982
last permit issued
Oct 30, 1982
completed
17K
cumulative oil, bbl
60.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 30, 1982
Shut in
—
Plugged
Oct 30, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Owen O-13-25608L.W.T. (Congl.)JDL Operating, LLC317K60.8KJan 1993 – Jul 2026
— O-13-22834——000—

Oil, barrels lease total

Last 12 months 233 · prior 12 347(-33%)

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lindemann, James D.Jan 1993 → Mar 2007
  2. 2JDL Operating, LLCApr 2007 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
175777-99DrillRopar Operating Co.Oct 13, 1982Oct 13, 1982—5,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-22834————
—— O-13-25608————

Formation tops

As filed on W-2/G-1. Subsea from 1,242 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo4,610-3,368
Marble Falls4,950-3,708

Perforations

Perforated and open-hole intervals.

FromToType
4,9534,964Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62525012.25225 S
2.3754,930——
4.55,1007.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 1, 2013Mar 6, 2013—
00Jan 12, 1984Nov 29, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

4.1K
bbl, last 12 reported months
102K
bbl, all reported
Oct 2020
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000103388H-1 InjectionPlugged Dec 11, 20201,0002,4704,953–4,964

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 4,100 · prior 12 4,430(-7%)

020040060020192020

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23734799, documented in the API reference.