WELL · 42-237-34909 · DISTRICT 9

Burt Myrtle #6-S

Plugged

Jack County · Jack County Regular field  · Vertical

Burt Myrtle #6-S (API 42-237-34909) is a plugged well in Jack County, plugged October 7, 1989, last operated by Self Charles Lynn.

The RRC has issued one drilling permit, issued December 16, 1982, permitted to 450 ft.

It was permitted by Vinson, Bud Production CO. and has since transferred to Self Charles Lynn on the wellbore schedule.

Completion filings report one formation top, including Gunsight.

Operator of record

Self Charles Lynn

Permitted by Vinson, Bud Production Co.; the EWA schedule now lists a different operator.

Jacksboro, TX · P-5 Y, filed Dec 4, 2025 · 11 permits on file · (940) 642-5873

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSelf Charles Lynn
Production reportsnone
Latest permitVinson, Bud Production Co.Dec 16, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

450
total depth, ft
1
permits on file
Dec 16, 1982
last permit issued
May 24, 1983
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 24, 1983
Shut in
—
Plugged
Oct 7, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
180440-99DrillVinson, Bud Production Co.Dec 16, 1982Dec 16, 1982May 19, 1983450

Formation tops

As filed on W-2/G-1. Subsea from 994 ft elevation.Download CSV →

FormationMD ftSubsea
Gunsight400594

Perforations

Perforated and open-hole intervals.

FromToType
400402Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.54226.7575 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 20, 1989Sep 18, 1989—
00Oct 11, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Oct 1989
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000048924H-1 InjectionPlugged Oct 20, 198980150400–409

MONTHLY INJECTED, BBL · H-10 · LAST 1 REPORTED MONTHS

Last 12 months 0

01

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23734909, documented in the API reference.