WELL · 42-237-36135 · DISTRICT 9

Plaster-Cooper #2

Plugged

Jack County · Kennedy (Atoka) field  · Vertical

Plaster-Cooper #2 (API 42-237-36135) is a plugged well in Jack County, plugged October 11, 2017, last operated by Ray Herring Operating CO. LLC.

The RRC has issued one drilling permit, issued June 7, 1984, permitted to 4,995 ft.

It was permitted by Rush, Charles Ray and has since transferred to Ray Herring Operating CO. LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Palo Pinto, Capps Lime, Bryson, Caddo.

Its 2 leases have reported 2.26K barrels of oil and 684 mcf of gas since January 1993, last reporting in March 2018. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Ray Herring Operating Co. LLC

Permitted by Rush, Charles Ray; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Dec 4, 2025 · 8 permits on file · (940) 550-8988

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRay Herring Operating Co. LLC
Production reportsRay Herring Operating Co., LLCthrough Nov 2016
Latest permitRush, Charles RayJun 7, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,995
total depth, ft
1
permits on file
Jun 7, 1984
last permit issued
Oct 25, 1984
completed
2.26K
cumulative oil, bbl
684
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2018

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 25, 1984
Shut in
—
Plugged
Oct 11, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Plaster-Cooper O-13-29115Kennedy (Atoka)Ray Herring Operating Co., LLC12.26K105Mar 1996 – Mar 2018
Plaster-Cooper G-13-117424Kennedy (Atoka)Herring, Ray10579Jan 1993 – Mar 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Herring, RayJan 1993 → Jun 2014
  2. 2Ray Herring EstateJul 2014 → Mar 2016
  3. 3Ray Herring Operating Co., LLCApr 2016 → Nov 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
241293-99DrillRush, Charles RayJul 11, 1985Jun 7, 1984Jul 14, 19844,995

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-117424————
—— O-13-29115————

Formation tops

As filed on W-2/G-1. Subsea from 1,168 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoPALO PINTO LIME1,226-58
Capps Lime1,870-702
BrysonBRYSON LIME3,005-1,837
CaddoCADDO LIME4,378-3,210
BendBEND CONGLOMERATE4,732-3,564
BendBEND CONGLOMERATE4,748-3,580
Marble FallsMARBLE FALLS LIME4,810-3,642

Perforations

Perforated and open-hole intervals.

FromToType
4,7354,741Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62538612.25290 S
4.54,9037.875220 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 8, 1996Mar 29, 1996—
00Apr 8, 1996——
00Aug 12, 1985Jul 9, 1985—
00Aug 6, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23736135, documented in the API reference.