WELL · 42-237-36239 · DISTRICT 9
Deaton E.A. Trust #2
Jack County · Southern Alliance (Caddo) field · Vertical
Deaton E.A. Trust #2 (API 42-237-36239) is a well in Jack County operated by Texas-Nevada Oil & Gas CO., completed October 24, 1984.
The RRC has issued one drilling permit, issued July 30, 1984, permitted to 4,999 ft.
Completion filings report 4 formation tops, including Palo Pinto, Caddo, Atokan, Marble Falls.
No lease production has been reported under this well’s leases.
Operator of record
Jacksboro, TX · P-5 Y, filed Dec 4, 1992 · 41 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texas-Nevada Oil & Gas Co. |
| Production reports | LKM Oil and Gas LLCthrough Mar 2026 |
| Latest permit | Texas-Nevada Oil & Gas Co.Jul 30, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,999
- total depth, ft
- 1
- permits on file
- Jul 30, 1984
- last permit issued
- Oct 24, 1984
- completed
- 0
- cumulative oil, bbl
- 47.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 24, 1984
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Deaton Trust G-13-118842 | Southern Alliance (Caddo) | LKM Oil and Gas LLC | 1 | 0 | 47.8K | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 42 · prior 12 119(-65%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tresami, Inc.Jan 1993 → May 2011
- 2Myers, A. J.Jun 2011 → Jun 2023
- 3LKM Oil & GasJul 2023 → Sep 2024
- 4LKM Oil and Gas LLCOct 2024 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 246625-99 | Drill | Texas-Nevada Oil & Gas Co. | Nov 1, 1984 | Jul 30, 1984 | — | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-118842 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,199 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 958 | 241 |
| Caddo | 4,289 | -3,090 |
| Atokan | 4,540 | -3,341 |
| Marble Falls | 4,800 | -3,601 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,410 | 4,412 | Perforated |
| 4,418 | 4,422 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 373 | 12.25 | 265 S |
| 4.5 | 4,848 | 7.875 | 280 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 23, 1985 | Oct 29, 1985 | — |
| 00 | Dec 12, 1985 | — | — |
| 00 | Feb 4, 1985 | Dec 27, 1984 | — |
| 00 | Jan 15, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-36239 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-36239 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23736239, documented in the API reference.