WELL · 42-237-36278 · DISTRICT 9

King #A2

Plugged

Jack County · Jack County Regular field  · Vertical

King #A2 (API 42-237-36278) is a plugged well in Jack County, plugged January 7, 2014, last operated by Petroleum Asset Management Corp.

The RRC has issued 2 drilling permits between 1984 and 1986, permitted to 5,124 ft.

It was permitted by Campaign Production, Inc. and has since transferred to Petroleum Asset Management Corp on the wellbore schedule.

Completion filings report 3 formation tops, including Buttram Sand, Caddo, Marble Falls.

Its lease has reported 1.87K barrels of oil and 23 mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Petroleum Asset Management Corp

Permitted by Campaign Production, Inc.; the EWA schedule now lists a different operator.

Richardson, TX · P-5 Y, filed Feb 4, 2026 · 1 permits on file · (214) 926-9228

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetroleum Asset Management Corp
Production reportsPetroleum Asset Management Corpthrough Sep 2011
Latest permitCampaign Production, Inc.Jul 8, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,124
total depth, ft
2
permits on file
Jul 8, 1986
last permit issued
Jul 8, 1986
completed
1.87K
cumulative oil, bbl
23
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 8, 1986
Shut in
—
Plugged
Jan 7, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King O-13-26270Jack County RegularPetroleum Asset Management Corp11.87K23Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Associated Operating & Explor.Jan 1993 → Apr 1993
  2. 2Viola Prod., Inc.May 1993 → Sep 1994
  3. 3Regency Resources CorporationOct 1994 → Feb 1997
  4. 4Gulf States Petro. Corp.Mar 1997 → May 2000
  5. 5Petroleum Asset Management CorpJul 2011 → Sep 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
303909-99RecompletionCampaign Production, Inc.Jul 7, 1986Jul 8, 1986—5,124
247930-99DrillCampaign Production, Inc.Apr 19, 1985Aug 9, 1984—5,124

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-26270————

Formation tops

As filed on W-2/G-1. Subsea from 1,172 ft elevation.Download CSV →

FormationMD ftSubsea
Buttram Sand2,242-1,070
Caddo4,484-3,312
Marble Falls4,984-3,812

Perforations

Perforated and open-hole intervals.

FromToType
4,0504,053Perforated
4,1864,188Perforated
4,1944,202Perforated
4,8764,886Perforated
4,9634,969Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62530011130 S
8.62532511—
4.55,1247.875—
4.55,1407.875185 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 4, 1986Jul 23, 1986Yes
00Jul 31, 1986——
00May 30, 1985Apr 4, 1985—
00May 16, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23736278, documented in the API reference.