WELL · 42-237-36353 · DISTRICT 9

Fowler #9

Plugged

Jack County · Jack County Regular field  · Vertical

Fowler #9 (API 42-237-36353) is a plugged well in Jack County, plugged June 9, 2010, last operated by Jonco.

The RRC has issued one drilling permit (amended once), issued September 6, 1984, permitted to 1,000 ft.

It was permitted by Wes Pro, Inc. and has since transferred to Jonco on the wellbore schedule.

Completion filings report one formation top, including Gunsight.

Its lease has reported 28.8K barrels of oil and 40 mcf of gas since January 1993, last reporting in July 2026. The lease carries 11 wells, so these are lease totals, not this well alone.

Operator of record

Jonco

Permitted by Wes Pro, Inc.; the EWA schedule now lists a different operator.

Jacksboro, TX · P-5 Y, filed Dec 4, 2025 · 17 permits on file · (940) 456-4382

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJonco
Production reportsJoncothrough Feb 2026
Latest permitTexas-Nevada Oil & Gas Co.Sep 6, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,000
total depth, ft
2
permits on file
Sep 6, 1984
last permit issued
Jul 22, 1987
completed
28.8K
cumulative oil, bbl
40
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 22, 1987
Shut in
—
Plugged
Jun 9, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fowler O-13-24650Jack County RegularJonco1128.8K40Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 357 · prior 12 300(+19%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tresami, Inc.Jan 1993 → Oct 1997
  2. 2Wes Pro, Inc.Jan 1998 → Jan 2013
  3. 3M3 Oil Company, LLCFeb 2013 → Sep 2017
  4. 4Stamper Operating Co., Inc.Oct 2017 → Sep 2019
  5. 5JoncoOct 2019 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
250729-98DrillWes Pro, Inc.Apr 14, 1998Sep 6, 1984—700
250729-99DrillTexas-Nevada Oil & Gas Co.Sep 4, 1984Sep 6, 1984—1,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-24650————

Formation tops

As filed on W-2/G-1. Subsea from 997 ft elevation.Download CSV →

FormationMD ftSubsea
GunsightGUNSIGHT LIME614383
GunsightGUNSIGHT SAND620377

Perforations

Perforated and open-hole intervals.

FromToType
617625Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.56906.75150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 17, 1987Dec 2, 1987—
00Oct 17, 1984Sep 17, 1984—
00Sep 25, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

3.07K
bbl, last 12 reported months
39.1M
bbl, all reported
Oct 2004
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000063730H-1 InjectionPlugged Jun 30, 2010200300617–625

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 3,070 · prior 12 4,100(-25%)

020040020032004

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23736353, documented in the API reference.