WELL · 42-237-36839 · DISTRICT 9
Cranford #1
Jack County · Cranford (Congl.) field · Vertical
Cranford #1 (API 42-237-36839) is a plugged well in Jack County, plugged July 2, 2004, last operated by Dynamic Production Inc..
The RRC has issued one drilling permit, issued June 27, 1985, permitted to 6,000 ft.
It was permitted by Texas-Nevada Oil & Gas CO. and has since transferred to Dynamic Production Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Base Pregnant Shale, Atokan Section, Marble Falls.
Operator of record
Permitted by Texas-Nevada Oil & Gas Co.; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Jan 4, 2026 · 276 permits on file · (817) 291-4410
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Dynamic Production Inc. |
| Production reports | Dynamic Production, Inc.through Sep 2002 |
| Latest permit | Texas-Nevada Oil & Gas Co.Jun 27, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,000
- total depth, ft
- 1
- permits on file
- Jun 27, 1985
- last permit issued
- Oct 14, 1985
- completed
- 0
- cumulative oil, bbl
- 21.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 14, 1985
- Shut in
- —
- Plugged
- Jul 2, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cranford G-13-120061 | Cranford (Congl.) | Dynamic Production, Inc. | 1 | 0 | 21.4K | Jan 1993 – Oct 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tresami, Inc.Jan 1993 → Jun 1995
- 2Dynamic Production, Inc.Jul 1998 → Sep 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 279044-99 | Drill | Texas-Nevada Oil & Gas Co. | Jun 24, 1985 | Jun 27, 1985 | — | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-120061 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,112 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Pregnant Shale | 4,650 | -3,538 |
| Atokan Section | 4,750 | -3,638 |
| Marble Falls | 5,370 | -4,258 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,312 | 5,317 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 820 | 12.25 | 410 S |
| 4.5 | 5,462 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 5, 1986 | Jan 22, 1986 | Yes |
| 00 | Mar 1, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-36839 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-36839 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23736839, documented in the API reference.