WELL · 42-237-36877 · DISTRICT 9
Moore #8
Jack County · Carey & Riggs (Swastika) field · Vertical
Moore #8 (API 42-237-36877) is a plugged well in Jack County, plugged February 2, 2001, last operated by Aruba Petroleum Inc..
The RRC has issued one drilling permit, issued July 31, 1985, permitted to 1,000 ft.
It was permitted by Vintage Oil And Gas CO. and has since transferred to Aruba Petroleum Inc. on the wellbore schedule.
Completion filings report one formation top, including Gunsight.
Its 2 leases have reported 2.84K barrels of oil and 71 mcf of gas since January 1993, last reporting in March 2008. The leases carry 34 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Vintage Oil and Gas Co.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Jul 8, 2022 · 427 permits on file · (940) 390-5604
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Aruba Petroleum Inc. |
| Production reports | Aruba Petroleum, Inc.through Jan 2002 |
| Latest permit | Vintage Oil and Gas Co.Jul 31, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,000
- total depth, ft
- 1
- permits on file
- Jul 31, 1985
- last permit issued
- Aug 7, 1985
- completed
- 2.84K
- cumulative oil, bbl
- 71
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 7, 1985
- Shut in
- —
- Plugged
- Feb 2, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 34 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Moore O-13-17757 | Carey & Riggs (Swastika) | Aruba Petroleum, Inc. | 23 | 2.84K | 71 | Jan 1993 – Mar 2008 |
| Moore -B- O-13-25708 | Carey & Riggs (Swastika) | Aruba Petroleum, Ltd. | 11 | 0 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Poteet Operating Co.Jan 1993 → Aug 1994
- 2Aruba Petroleum, Ltd.Oct 1994 → Sep 1995
- 3Aruba Petroleum, Inc.Oct 1995 → Jan 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 281463-99 | Drill | Vintage Oil and Gas Co. | Jul 31, 1985 | Jul 31, 1985 | — | 1,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-17757 | — | — | — | — |
| — | — O-13-25708 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 534 | 540 | Perforated |
| 605 | 608 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 5.5 | 630 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 25, 1995 | Oct 23, 1985 | Yes |
| 00 | Nov 15, 1985 | Oct 23, 1985 | Yes |
| 00 | Nov 6, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-36877 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-36877 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23736877, documented in the API reference.