WELL · 42-237-37222 · DISTRICT 9
Ellis & Dubose -F- #1B
Jack County · Jack County Regular field · Vertical
Ellis & Dubose -F- #1B (API 42-237-37222) is a plugged well in Jack County, plugged December 23, 2021, last operated by DM Backhoe Service.
The RRC has issued one drilling permit, issued September 4, 1986, permitted to 600 ft.
It was permitted by Beisch & Hanna, Inc. and has since transferred to DM Backhoe Service on the wellbore schedule.
Completion filings report 2 formation tops, including Trinity Water Sand, Gunsight.
Its lease has reported 67.7K barrels of oil and 191 mcf of gas since January 1993, last reporting in July 2026. The lease carries 62 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Beisch & Hanna, Inc.; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed May 4, 2026 · (940) 636-3263
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | DM Backhoe Service |
| Production reports | DM Backhoe Servicethrough Apr 2026 |
| Latest permit | Beisch & Hanna, Inc.Sep 4, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 600
- total depth, ft
- 1
- permits on file
- Sep 4, 1986
- last permit issued
- Sep 16, 1986
- completed
- 67.7K
- cumulative oil, bbl
- 191
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 16, 1986
- Shut in
- —
- Plugged
- Dec 23, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 62 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ellis & Dubose -F- O-13-3398 | Jack County Regular | DM Backhoe Service | 62 | 67.7K | 191 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 1,023 · prior 12 1,167(-12%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Beisch & HannaJan 1993 → Oct 1994
- 2Beisch, RustyNov 1994 → Apr 2015
- 3Txon Partners, LLCMay 2015 → Jun 2017
- 4White Knight Production LLCJul 2017 → Jan 2020
- 5T & R Operating, LLCFeb 2020 → Feb 2024
- 6DM Backhoe ServiceMar 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 320039-99 | Drill | Beisch & Hanna, Inc. | Sep 2, 1986 | Sep 4, 1986 | — | 600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-3398 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 450 | 482 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 496 | 7.875 | 80 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 9, 1986 | Sep 22, 1986 | Yes |
| 00 | Sep 30, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-37222 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-37222 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23737222, documented in the API reference.