WELL · 42-237-37414 · DISTRICT 9
Christi #1
Jack County · Callendar (Weir) field · Vertical
Christi #1 (API 42-237-37414) is a plugged well in Jack County, plugged May 15, 2001, last operated by 3-R Production Inc..
The RRC has issued one drilling permit, issued October 9, 1987, permitted to 2,500 ft.
It was permitted by Gator Energy and has since transferred to 3-R Production Inc. on the wellbore schedule.
Its lease has reported 268 barrels of oil and 21 mcf of gas since January 1993, last reporting in September 2003. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Gator Energy; the EWA schedule now lists a different operator.
Jacksboro, TX · P-5 Y, filed Mar 6, 2023 · 106 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | 3-R Production Inc. |
| Production reports | 3-R Production, Inc.through Feb 1999 |
| Latest permit | Gator EnergyOct 9, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,500
- total depth, ft
- 1
- permits on file
- Oct 9, 1987
- last permit issued
- Jan 23, 1990
- completed
- 268
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 23, 1990
- Shut in
- —
- Plugged
- May 15, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Christi O-13-27056 | Callendar (Weir) | 3-R Production, Inc. | 2 | 268 | 21 | Jan 1993 – Sep 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Gator EnergyJan 1993 → Jun 1993
- 23-R Production, Inc.Jul 1993 → Feb 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 337193-99 | Drill | Gator Energy | Oct 9, 1987 | Oct 9, 1987 | — | 2,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-27056 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,950 | 1,959 | Perforated |
| 1,950 | 1,959 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,956 | 7.875 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 16, 1990 | Feb 23, 1990 | — |
| 00 | Aug 30, 1988 | Aug 1, 1988 | Yes |
| 00 | Aug 5, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-37414 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-37414 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 79.5K
- bbl, all reported
- Oct 2001
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000071854 | H-1 Injection | Plugged Jun 13, 2001 | 200 | 800 | 1,954–1,959 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 1,475(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23737414, documented in the API reference.