WELL · 42-237-38109 · DISTRICT 9
Staley #1
Jack County · Gilley (Conglomerate) field · Vertical
Staley #1 (API 42-237-38109) is a well in Jack County operated by Excel Oil & Gas Inc., completed October 15, 1994.
The RRC has issued one drilling permit, issued June 15, 1994, permitted to 6,200 ft.
Completion filings report 2 formation tops, including Palo Pinto, Caddo.
Its 2 leases have reported 648 barrels of oil and 59.4K mcf of gas since October 1994, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Waxahachie, TX · P-5 Y, filed Aug 4, 2025 · 56 permits on file · (972) 351-4066
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Excel Oil & Gas Inc. |
| Production reports | Myers, A. J.through Sep 2022 |
| Latest permit | Excel Oil & Gas, Inc.Jun 15, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,200
- total depth, ft
- 1
- permits on file
- Jun 15, 1994
- last permit issued
- Oct 15, 1994
- completed
- 648
- cumulative oil, bbl
- 59.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1994 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 15, 1994
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Staley G-13-177522 | Gilley (Conglomerate) | A J Myers Prod. LLC | 1 | 0 | 21.4K | Apr 2000 – Jul 2026 |
| Staley O-13-28862 | Gilley (Conglomerate) | Excel Oil & Gas, Inc. | 1 | 648 | 37.9K | Oct 1994 – Jun 2001 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Excel Oil & Gas, Inc.Oct 1994 → Apr 2014
- 2Myers, A. J.May 2014 → Sep 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 424833-99 | Drill | Excel Oil & Gas, Inc. | Jun 13, 1994 | Jun 15, 1994 | Jul 21, 1994 | 6,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-177522 | — | — | — | — |
| — | — O-13-28862 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,104 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 1,558 | -454 |
| Palo PintoPALO PINTO LIME | 1,558 | -454 |
| Caddo | 5,552 | -4,448 |
| CaddoCADDO CONG | 5,712 | -4,608 |
| CaddoCADDO CONGLOMERATE | 5,712 | -4,608 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,712 | 5,854 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 517 | 12.25 | 215 S |
| 4.5 | 5,986 | 7.875 | 185 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 7, 2000 | Jun 13, 2000 | — |
| 00 | Jul 12, 2000 | — | — |
| 00 | Nov 18, 1994 | Oct 20, 1994 | Yes |
| 00 | Oct 28, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-38109 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-38109 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23738109, documented in the API reference.