WELL · 42-237-38163 · DISTRICT 9

Maxey Estate #23

Y

Jack County · Jack County Regular field · Injection  · Vertical

Maxey Estate #23 (API 42-237-38163) is a well in Jack County operated by Self Charles Lynn, completed April 13, 2022 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued April 21, 1995, permitted to 750 ft.

It was permitted by Daily, Carroll and has since transferred to Self Charles Lynn on the wellbore schedule.

Completion filings report one formation top, including Gunsight.

Its lease has reported 35.3K barrels of oil and 79 mcf of gas since January 1993, last reporting in July 2026. The lease carries 16 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 6.05K barrels injected in the 12 months reported through October 2025.

Operator of record

Self Charles Lynn

Permitted by Daily, Carroll; the EWA schedule now lists a different operator.

Jacksboro, TX · P-5 Y, filed Dec 4, 2025 · 11 permits on file · (940) 642-5873

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSelf Charles Lynn
Production reportsSelf, Charles Lynnthrough Apr 2026
Latest permitDaily, CarrollApr 21, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

750
total depth, ft
1
permits on file
Apr 21, 1995
last permit issued
Apr 13, 2022
completed
35.3K
cumulative oil, bbl
79
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 13, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 16 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Maxey Estate O-13-12443Jack County RegularSelf, Charles Lynn1635.3K79Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 743 · prior 12 680(+9%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Moller, Herbert T.Jan 1993 → Feb 1994
  2. 2Daily, CarrollMar 1994 → Sep 2023
  3. 3Self, Charles LynnOct 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
434995-99DrillDaily, CarrollApr 19, 1995Apr 21, 1995May 4, 1995750

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-12443————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Gunsight523

Perforations

Perforated and open-hole intervals.

FromToType
477484Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.55596.75100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 20, 2024Nov 18, 2022—
00Aug 12, 1996Apr 19, 1996—
00Jul 14, 1995May 24, 1995Yes
00May 31, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

6.05K
bbl, last 12 reported months
707K
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000083333H-1 InjectionActive150235477–484

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 6,050 · prior 12 7,740(-22%)

05001K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23738163, documented in the API reference.