WELL · 42-237-38286 · DISTRICT 9

Tanner #1

Plugged

Jack County · Rusmag SE. (Congl. 4900) field  · Vertical

Tanner #1 (API 42-237-38286) is a plugged well in Jack County, plugged September 12, 2002, last operated by Excel Oil & Gas Inc..

The RRC has issued one drilling permit (amended once), issued May 19, 1997, permitted to 6,000 ft.

Completion filings report 3 formation tops, including Palo Pinto, Caddo, Pregnant Shale.

Operator of record

Excel Oil & Gas Inc.

Waxahachie, TX · P-5 Y, filed Aug 4, 2025 · 56 permits on file · (972) 351-4066

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExcel Oil & Gas Inc.
Production reportsExcel Oil & Gas, Inc.through Dec 2000
Latest permitExcel Oil & Gas, Inc.May 19, 1997
6,000
total depth, ft
2
permits on file
May 19, 1997
last permit issued
Sep 10, 1997
completed
0
cumulative oil, bbl
15.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1997 THROUGH Sep 2002

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 10, 1997
Shut in
—
Plugged
Sep 12, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tanner G-13-165317Rusmag, SE. (Congl. 4900)Excel Oil & Gas, Inc.1015.1KSep 1997 – Sep 2002

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Excel Oil & Gas, Inc.Sep 1997 → Dec 2000

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
462400-98DrillExcel Oil & Gas, Inc.Oct 15, 1997May 19, 1997May 29, 19975,442
462400-99DrillExcel Oil & Gas, Inc.May 14, 1997May 19, 1997—6,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-165317————

Formation tops

As filed on W-2/G-1. Subsea from 1,029 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto1,112-83
CaddoCADDO LM.4,357-3,328
Pregnant Shale4,660-3,631

Perforations

Perforated and open-hole intervals.

FromToType
4,8844,920Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62581012.25375 S
4.55,4407.875370 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 10, 1997Oct 15, 1997Yes
00Dec 3, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23738286, documented in the API reference.