WELL · 42-237-38720 · DISTRICT 9

Henderson Monroe #1

Plugged

Jack County · Jack County Regular field  · Vertical

Henderson Monroe #1 (API 42-237-38720) is a plugged well in Jack County, plugged April 18, 2014, last operated by Threshold Development Company.

The RRC has issued 2 drilling permits between 2003 and 2004, permitted to 5,200 ft.

Completion filings report 8 formation tops, including Weir Sand, Weir Sd, Buttram Sand, Buttram Sd.

Its 2 leases have reported 2.1K barrels of oil and 106K mcf of gas since September 2003, last reporting in February 2016. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Threshold Development Company

Fort Worth, TX · P-5 Y, filed Aug 5, 2016 · 293 permits on file · (817) 937-6969

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleThreshold Development Company
Production reportsHerring, Raythrough Jun 2014
Latest permitThreshold Development Co.Jul 29, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,200
total depth, ft
2
permits on file
Jul 29, 2004
last permit issued
Sep 3, 2003
completed
2.1K
cumulative oil, bbl
106K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2003 THROUGH Feb 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 3, 2003
Shut in
—
Plugged
Apr 18, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Henderson, Monroe G-13-202787Hoefle (Pool)Ray Herring Estate1039.8KSep 2003 – Feb 2016
Henderson, Monroe O-13-30224Jack County RegularThreshold Development Company12.1K66.2KSep 2003 – Oct 2004

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Threshold Development CompanySep 2003 → Jun 2010
  2. 2Herring, RayJul 2010 → Jun 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
548895-99Field transferThreshold Development Co.Jul 29, 2004Jul 29, 2004Jun 25, 20035,200
532303-99DrillThreshold Development Co.May 23, 2003May 23, 2003Jun 25, 20035,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-202787————
—— O-13-30224————

Formation tops

As filed on W-2/G-1. Subsea from 984 ft elevation.Download CSV →

FormationMD ftSubsea
Weir Sand2,590-1,606
Weir SD2,590-1,606
Buttram Sand2,778-1,794
Buttram SD2,778-1,794
BrysonBRYSON LIME3,442-2,458
CaddoCADDO LIME4,682-3,698
AtokaATOKA CONGLOMERATE4,961-3,977
Marble Falls4,980-3,996
Marble FallsMARBLE FALLS LIME4,980-3,996

Perforations

Perforated and open-hole intervals.

FromToType
4,6804,710Perforated
4,7734,778Perforated
4,9624,978Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62538212.25225 S
5.55,0727.875225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 25, 2004Sep 14, 2004—
00Oct 22, 2004Aug 6, 2004—
00Aug 16, 2004——
00Dec 10, 2003Nov 4, 2003Yes
00Nov 26, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23738720, documented in the API reference.