WELL · 42-237-38956 · DISTRICT 9
Joe Shown Trust Unit #1
Jack County · Newark East (Barnett Shale) field · Vertical
Joe Shown Trust Unit #1 (API 42-237-38956) is a well in Jack County operated by S.B. Street Operating Inc., completed July 31, 2007.
The RRC has issued 2 drilling permits (amended once) between 2006 and 2012, permitted to 5,999 ft.
Completion filings report 7 formation tops, including Bryson, T/Caddo Lime, Caddo, T/Marble Falls.
Its 2 leases have reported 4.28K barrels of oil and 30.1K mcf of gas since July 2007, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Graham, TX · P-5 Y, filed Dec 4, 2025 · 274 permits on file · (325) 226-1585
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | S.B. Street Operating Inc. |
| Production reports | G & F Oil, Inc.through Apr 2026 |
| Latest permit | S.B. Street Operating, Inc.Sep 26, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,999
- total depth, ft
- 3
- permits on file
- Sep 26, 2012
- last permit issued
- Jul 31, 2007
- completed
- 4.28K
- cumulative oil, bbl
- 30.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 31, 2007
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Joe Shown Trust Unit O-13-32218 | Antelope,s.e. (Marble Falls) | G & F Oil, Inc. | 1 | 3.5K | 17.6K | Apr 2012 – Jul 2026 |
| Joe Shown Trust Unit O-13-30943 | Newark, East (Barnett Shale) | S.B. Street Operating, Inc. | 1 | 777 | 12.5K | Jul 2007 – Nov 2012 |
Oil, barrels lease total
Last 12 months 186 · prior 12 170(+9%)
Gas, mcf lease total
Last 12 months 1,062 · prior 12 980(+8%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mortimer Production CompanyJul 2007 → Feb 2008
- 2S.B. Street Operating, Inc.Mar 2008 → Feb 2016
- 3G & F Oil, Inc.Nov 2016 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 748082-99 | Recompletion | S.B. Street Operating, Inc. | Sep 11, 2012 | Sep 26, 2012 | Apr 6, 2012 | 5,800 |
| 622085-98 | Drill | Bommer Engineering Co. | Aug 18, 2006 | Jul 6, 2006 | Aug 3, 2006 | 5,999 |
| 622085-99 | Drill | Bommer Engineering Co. | Jul 6, 2006 | Jul 6, 2006 | — | 5,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-30943 | — | — | — | — |
| — | — O-13-32218 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,068 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BrysonTOP OF BRYSON | 3,495 | -2,427 |
| T/Caddo Lime | 4,800 | -3,732 |
| CaddoTOP OF CADDO LIME | 4,800 | -3,732 |
| T/Marble Falls | 5,052 | -3,984 |
| Marble FallsTOP OF MARBLE FALLS LIME | 5,052 | -3,984 |
| T/Barnett Shale | 5,432 | -4,364 |
| BarnettTOP OF BARNETT SHALE | 5,432 | -4,364 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,236 | 5,256 | Perforated |
| 5,272 | 5,284 | Perforated |
| 5,575 | 5,638 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 435 | 12.25 | 638 S |
| 4.5 | 5,738 | 7.875 | 570 S |
| 4.5 | 5,739 | 7.875 | 570 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 17, 2012 | May 14, 2012 | — |
| 00 | Apr 23, 2008 | Nov 19, 2007 | Yes |
| 00 | Apr 4, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-38956 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-38956 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23738956, documented in the API reference.