WELL · 42-237-39108 · DISTRICT 9
Kelsay A #1H
Jack County · Newark East (Barnett Shale) field · Temp Abandoned · Horizontal
Kelsay A #1H (API 42-237-39108) is a horizontal well in Jack County operated by Arrowhead Productions LP, completed December 31, 2007 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued June 13, 2007, permitted to 6,200 ft.
It was permitted by Eog Resources, Inc. and has since transferred to Arrowhead Productions LP on the wellbore schedule.
Completion filings report 7 formation tops, including Strawn, Bend, Marble Falls, Marble Falsl.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by EOG Resources, Inc.; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Jun 29, 2026 · 17 permits on file · (940) 567-1145
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Arrowhead Productions LP |
| Production reports | Arrowhead Productions, LPthrough Dec 2018 |
| Latest permit | EOG Resources, Inc.Jun 25, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,200
- total depth, ft
- 2
- permits on file
- Jun 25, 2007
- last permit issued
- Dec 31, 2007
- completed
- 0
- cumulative oil, bbl
- 498K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 31, 2007
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kelsay A G-13-251545 | Newark, East (Barnett Shale) | Arrowhead Productions, LP | 1 | 0 | 498K | Dec 2007 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EOG Resources, Inc.Dec 2007 → Apr 2017
- 2Arrowhead Productions, LPMay 2017 → Dec 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 640188-98 | Drill | EOG Resources, Inc. | Jun 14, 2007 | Jun 25, 2007 | Oct 16, 2007 | 6,200 |
| 640188-99 | Drill | EOG Resources, Inc. | Jun 5, 2007 | Jun 13, 2007 | — | 6,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-251545 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,192 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,808 | 9,028 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7 | 577 | 9.625 | 230 S |
| 4.5 | 9,078 | 6.75 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 5, 2014 | Oct 24, 2014 | — |
| 00 | Nov 19, 2009 | Feb 28, 2008 | Yes |
| 00 | Oct 9, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-39108 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-39108 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23739108, documented in the API reference.