WELL · 42-237-39296 · DISTRICT 9
R.L. Martin #S 1
Jack County · Strawn (Marble Falls 3770) field · Vertical
R.L. Martin #S 1 (API 42-237-39296) is a plugged well in Jack County, plugged February 5, 2019, last operated by Quest-Tex Energy OP II LLC.
The RRC has issued one drilling permit (amended once), issued August 20, 2009, permitted to 7,000 ft.
It was permitted by Swan PC, LP and has since transferred to Quest-Tex Energy OP II LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Strawn, Caddo, Marble Falls.
Its lease has reported 138 barrels of oil and 8.8K mcf of gas since November 2009, last reporting in July 2026.
Operator of record
Permitted by Swan PC, LP; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Feb 4, 2026 · (214) 226-2606
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Quest-Tex Energy OP II LLC |
| Production reports | Brigadier Operating, LLCthrough Dec 2014 |
| Latest permit | Swan Production Co.Aug 20, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 2
- permits on file
- Aug 20, 2009
- last permit issued
- Nov 10, 2009
- completed
- 138
- cumulative oil, bbl
- 8.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2009 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 10, 2009
- Shut in
- —
- Plugged
- Feb 5, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| R.L. Martin O-13-31548 | Strawn (Marble Falls 3770) | Quest-Tex Energy OP II, LLC | 1 | 138 | 8.8K | Nov 2009 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Swan PC, LPDec 2009 → Aug 2012
- 2Brigadier Operating, LLCMay 2013 → Dec 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 684281-98 | Drill | Swan PC, LP | Jan 8, 2010 | Aug 20, 2009 | Aug 26, 2009 | 7,000 |
| 684281-99 | Drill | Swan Production Co. | Aug 19, 2009 | Aug 20, 2009 | Aug 26, 2009 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-31548 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,055 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawn | 3,674 | -2,619 |
| Caddo | 4,585 | -3,530 |
| Marble Falls | 5,163 | -4,108 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,674 | 3,690 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 208 | 12.25 | 150 S |
| 4.5 | 5,724 | 7.875 | 325 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 5, 2010 | Apr 5, 2010 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-39296 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-39296 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23739296, documented in the API reference.