WELL · 42-237-39588 · DISTRICT 9

Williams-Warren #S 1

N

Jack County · KRS (Marble Falls) field  · Vertical

Williams-Warren #S 1 (API 42-237-39588) is a well in Jack County operated by Petrobal Omega 1 LLC, completed July 13, 2012.

The RRC has issued 3 drilling permits between 2012 and 2016, permitted to 7,000 ft.

It was permitted by Brigadier Operating, LLC and has since transferred to Petrobal Omega 1 LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Pregant Shale, Pregnant Shale, Marble Falls, Comyn.

Its 3 leases have reported 10.8K barrels of oil and 344K mcf of gas since July 2012, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Petrobal Omega 1 LLC

Permitted by Brigadier Operating, LLC; the EWA schedule now lists a different operator.

Little Elm, TX · P-5 Y, filed Mar 4, 2026 · 125 permits on file · (956) 832-9802

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetrobal Omega 1 LLC
Production reportsEagleridge Operating, LLCthrough Apr 2026
Latest permitBrigadier Operating, LLCMay 25, 2016

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,000
total depth, ft
3
permits on file
May 25, 2016
last permit issued
Jul 13, 2012
completed
10.8K
cumulative oil, bbl
344K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 13, 2012
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Williams-Warren G-13-284076Bartons Chapel, S. (Strawn)Eagleridge Operating, LLC10214KJun 2016 – Jul 2026
Williams-Warren O-13-33311KRS (Marble Falls)Petrobal Omega 1, LLC14.76K65.1KAug 2013 – Jul 2026
Williams-Warren O-13-32555JMG Mag (Miss)Brigadier Operating, LLC16.06K64.9KJul 2012 – Feb 2016

Gas, mcf lease total

Last 12 months 4,015 · prior 12 4,362(-8%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Swan PC, LPJul 2012 → Nov 2012
  2. 2Brigadier Operating, LLCDec 2012 → May 2016
  3. 3Petrobal Omega 1, LLCJun 2016 → Jul 2021
  4. 4Eagleridge Operating, LLCAug 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
815843-99RecompletionBrigadier Operating, LLCMay 21, 2016May 25, 2016Jun 6, 20165,324
804104-99Field transferBrigadier Operating, LLCFeb 24, 2015Feb 26, 2015Jun 12, 20125,324
741558-99DrillSwan PC, LPMay 25, 2012Jun 2, 2012Jun 12, 20127,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-284076————
—— O-13-32555————
—— O-13-33311————

Formation tops

As filed on W-2/G-1. Subsea from 1,078 ft elevation.Download CSV →

FormationMD ftSubsea
Pregant Shale4,300-3,222
Pregnant Shale4,300-3,222
Marble Falls4,912-3,834
Comyn5,250-4,172
Comyn Lime5,250-4,172

Perforations

Perforated and open-hole intervals.

FromToType
3,6523,751Perforated
4,9385,206Perforated
4,9385,210Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62521812.25150 S
5.55,3007.875195 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 16, 2018Aug 29, 2018—
00Jun 8, 2018Feb 27, 2018—
00Nov 2, 2015Feb 28, 2015Yes
00Jun 24, 2013Aug 14, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23739588, documented in the API reference.