WELL · 42-239-02205 · DISTRICT 2
L. Ranch Co. "A" #41H
Jackson County · Lolita (5800) field · Vertical
L. Ranch CO. "A" #41H (API 42-239-02205) is a well in Jackson County operated by Humble Products Inc., completed November 1, 1963.
The RRC has issued one drilling permit, issued August 13, 1979, permitted to 8,630 ft.
It was permitted by Exxon Corp. and has since transferred to Humble Products Inc. on the wellbore schedule.
Its 3 leases have reported 7.81K barrels of oil and 4.44K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
Huntsville, TX · P-5 Y, filed Apr 14, 1983 · 2 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Humble Products Inc. |
| Production reports | Osyka Permian, LLCthrough Jul 2008 |
| Latest permit | Exxon Corp.Aug 13, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,630
- total depth, ft
- 1
- permits on file
- Aug 13, 1979
- last permit issued
- Nov 1, 1963
- completed
- 7.81K
- cumulative oil, bbl
- 4.44K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 1, 1963
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| -L- Ranch Co. -A- O-2-2229 | Lolita (Mopac Sand) | McGowan Working Partners, Inc. | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
| -L- Ranch Co. -A- O-2-4269 | Lolita (41-A) | McGowan Working Partners, Inc. | 1 | 319 | 0 | Jan 1993 – Jul 2026 |
| -L- Ranch Co. -A- O-2-5840 | Lolita (Miner Sand) | McGowan Working Partners, Inc. | 1 | 7.49K | 4.44K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Oil Well Buyers Corp.Jan 1993 → Mar 2000
- 2Texas Petroleum Investment Co.Apr 2003 → May 2003
- 3Osyka Permian, LLCApr 2005 → Jul 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 55386-99 | Recompletion | Exxon Corp. | Aug 13, 1979 | Aug 13, 1979 | — | 8,630 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-2-2229 | — | — | — | — |
| — | — O-2-4269 | — | — | — | — |
| — | — O-2-5840 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,723 | 5,730 | Perforated |
| 5,808 | 5,816 | Perforated |
| — | 5,995 | Perforated |
| — | 6,440 | Perforated |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jan 17, 1980 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-02205 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-02205 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23902205, documented in the API reference.