WELL · 42-239-02223 · DISTRICT 2

Four Way Ranch #29

Y

Jackson County · Lolita Deep (4-Way Zone) field · Shut IN  · Vertical

Four Way Ranch #29 (API 42-239-02223) is a well in Jackson County operated by Mcgowan Working Partners Inc., completed February 1, 2009 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued January 22, 2009, permitted to 6,950 ft.

It was permitted by Legado Gulf Coast, LLC and has since transferred to Mcgowan Working Partners Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Marg C, Greta, Menefee, Ward.

Its 2 leases have reported 40.3K barrels of oil and 167K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

McGowan Working Partners Inc.

Permitted by Legado Gulf Coast, LLC; the EWA schedule now lists a different operator.

Jackson, MS · P-5 Y, filed Aug 4, 2025 · 60 permits on file · (800) 224-4572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMcGowan Working Partners Inc.
Production reportsMcGowan Working Partners, Inc.through Apr 2026
Latest permitLegado Gulf Coast, LLCJan 22, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,950
total depth, ft
1
permits on file
Jan 22, 2009
last permit issued
Feb 1, 2009
completed
40.3K
cumulative oil, bbl
167K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 1, 2009
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Four-Way Ranch O-2-857Lolita, Deep (7000 Zone)McGowan Working Partners, Inc.21.5K0Jan 1993 – Jul 2026
Four Way Ranch O-2-9298Lolita, Deep (4-Way Zone)McGowan Working Partners, Inc.138.8K167KFeb 2009 – Jul 2026

Gas, mcf lease total

Last 12 months 11,880 · prior 12 11,748(+1%)

05001K1.5K202420252026

Oil, barrels lease total

Last 12 months 993 · prior 12 1,429(-31%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Osyka Permian, LLCDec 2006 → Feb 2008
  2. 2Legado Gulf Coast, LLCFeb 2009 → Apr 2010
  3. 3McGowan Working Partners, Inc.May 2010 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
676667-99RecompletionLegado Gulf Coast, LLCDec 22, 2008Jan 22, 2009Jan 26, 20096,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-857————
—— O-2-9298————

Formation tops

As filed on W-2/G-1. Subsea from 41 ft elevation.Download CSV →

FormationMD ftSubsea
Marg C5,336-5,295
Greta5,410-5,369
Menefee5,841-5,800
Ward5,959-5,918
Four Way Sand6,386-6,345
8000 Sand8,010-7,969

Perforations

Perforated and open-hole intervals.

FromToType
6,3906,402Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,32915—
78,10757978 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 22, 2009Feb 27, 2009Yes
00May 8, 2009——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23902223, documented in the API reference.