WELL · 42-239-02848 · DISTRICT 2

Toney M. H. Mrs. #38

N

Jackson County · West Ranch (Ward) field  · Vertical

Toney M. H. Mrs. #38 (API 42-239-02848) is a well in Jackson County operated by Hilcorp Energy Company, completed March 6, 1987.

The RRC has issued one drilling permit, issued July 12, 1995, permitted to 5,719 ft.

It was permitted by Meridian Oil Production Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Miocene (undifferentiated), Anahuac, Frio.

Its 2 leases have reported 43.8K barrels of oil and 79.6K mcf of gas since January 1993, last reporting in July 2026. The leases carry 8 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Meridian Oil Production Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Sep 2012
Latest permitMeridian Oil Production Inc.Jul 12, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,719
total depth, ft
1
permits on file
Jul 12, 1995
last permit issued
Mar 6, 1987
completed
43.8K
cumulative oil, bbl
79.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 6, 1987
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Toney, M. H., Mrs. O-2-1670West Ranch (Ward)Hilcorp Energy Company38.04K21.1KJan 1993 – Jul 2026
Toney, M. H., Mrs. O-2-3202West Ranch (Toney)Hilcorp Energy Company535.7K58.5KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Dec 1993
  2. 2Meridian Oil Production Inc.Jan 1994 → Feb 1996
  3. 3Meridian Oil Inc.Mar 1996 → May 1996
  4. 4Vintage Petroleum, Inc.Feb 2001 → Sep 2005
  5. 5Hilcorp Energy CompanyApr 2008 → Sep 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
437788-99RecompletionMeridian Oil Production Inc.Jul 12, 1995Jul 12, 1995Jul 25, 19955,719

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-1670————
—— O-2-3202————

Formation tops

As filed on W-2/G-1. Subsea from 11 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE110
Anahuac4,490-4,479
Frio5,107-5,096
Frio5,170-5,159

Perforations

Perforated and open-hole intervals.

FromToType
5,4425,446Perforated
5,6775,686Perforated
5,6855,691Perforated
5,7135,719Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,520—850 S
9.6252,521——
5.54,435——
5.56,226—600 S
5.756,227——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 22, 2009Jan 26, 2009—
00Oct 27, 1995——
00Apr 21, 1987Mar 23, 1987—
00Feb 7, 1986Jan 28, 1986Yes
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23902848, documented in the API reference.