WELL · 42-239-30292 · DISTRICT 2

Silliman Gas Unit #14

N

Jackson County  · Vertical

Silliman Gas Unit #14 (API 42-239-30292) is a permitted well in Jackson County filed by KD Energy, LLC; no completion report is on file yet.

The RRC has issued 3 drilling permits between 2006 and 2012, permitted to 5,926 ft.

Completion filings report one formation top, including Frio.

Its 3 leases have reported 121K barrels of oil and 659K mcf of gas since January 1993, last reporting in July 2026. The leases carry 12 wells, so these are lease totals, not this well alone.

Operator of record

KD Energy, LLC

Houston, TX · P-5 Y, filed Mar 4, 2026 · 72 permits on file · (713) 368-7822

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsKD Energy, LLCthrough Apr 2026
Latest permitKD Energy, LLCOct 12, 2012
5,926
total depth, ft
3
permits on file
Oct 12, 2012
last permit issued
—
completed
121K
cumulative oil, bbl
659K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 12 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hultquist Unit 0/A O-2-3362Ganado,deep (Hultquist)KD Energy, LLC10121K615KJan 1993 – Jul 2026
Silliman Gas Unit G-2-248396Ganado (Frio 5550)KD Energy, LLC1017.5KFeb 2008 – Oct 2015
Silliman Gas Unit G-2-219568Ganado (F- 4-C Seg 2)Sue-Ann Operating, L.C.1026.5KDec 2005 – Feb 2008

Oil, barrels lease total

Last 12 months 2,115 · prior 12 2,082(+2%)

0100200300202420252026

Gas, mcf lease total

Last 12 months 974 · prior 12 44(+2114%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sue-Ann Production CompanyJan 1993 → Jun 1999
  2. 2Shell Western E&P Inc.Sep 1995 → Nov 1996
  3. 3Sue-Ann Operating, L.C.Jul 1999 → Jul 2008
  4. 4KD Energy, LLCFeb 2008 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
749467-99RecompletionKD Energy, LLCOct 5, 2012Oct 12, 2012—5,700
666411-99RecompletionSue-Ann Operating, L.C.Jul 9, 2008Aug 12, 2008Jan 25, 20085,700
613256-99RecompletionSue-Ann Operating, L.C.Jan 30, 2006Jan 31, 2006—5,926

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-219568————
—— G-2-248396————
—— O-2-3362————

Formation tops

As filed on W-2/G-1. Subsea from 56 ft elevation.Download CSV →

FormationMD ftSubsea
FrioFRIO 55505,494-5,438
FrioFRIO 4-C SEG 25,908-5,852
FrioFRIO 4C SEG 25,908-5,852
FrioFRIO (7-A)6,442-6,386
FrioFRIO 7A6,442-6,386

Perforations

Perforated and open-hole intervals.

FromToType
5,4945,500Perforated
5,9085,912Perforated
6,4146,420Perforated
6,6046,606Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,80915650 S
4.56,8639.8751,100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 22, 2009Jul 23, 2008Yes
00Jun 25, 2009——
00Feb 15, 2007Feb 10, 2006—
00Sep 28, 2006——
00Jan 12, 1984Apr 16, 1973—
00Jan 12, 1984Dec 8, 1972—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23930292, documented in the API reference.