WELL · 42-239-31947 · DISTRICT 2

Finley, Dee #3

N

Jackson County  · Vertical

Finley, Dee #3 (API 42-239-31947) is a permitted well in Jackson County filed by Tal-Con, Inc.; no completion report is on file yet.

The RRC has issued 7 drilling permits between 1983 and 1990, permitted to 7,400 ft.

Completion filings report 3 formation tops, including Miocene (undifferentiated), Frio, Vicksburg.

Its 2 leases have reported 4.62K barrels of oil and 2.84K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Tal-Con, Inc.

Houston, TX · P-5 Y, filed Apr 13, 2001 · 7 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsPitchfork Oil & Gas, Inc.through Jan 2004
Latest permitTal-Con, Inc.Sep 4, 1990
7,400
total depth, ft
7
permits on file
Sep 4, 1990
last permit issued
—
completed
4.62K
cumulative oil, bbl
2.84K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Finley, Dee O-2-7640Palmetto Bend, W. (a-8 Frio)Pitchfork Oil & Gas, Inc.14.62K2.84KJan 1993 – Jul 2026
— O-2-7035——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ffa Petroleum ServicesApr 1993 → Mar 1994
  2. 2Pace West Production LCFeb 1995 → Sep 1995
  3. 3Emerald Oil & Gas LCOct 1995 → Aug 1996
  4. 4Compression - Trans Carriers IncOct 1996 → Dec 1999
  5. 5Pitchfork Oil & Gas, Inc.Apr 2000 → Jan 2004

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
377309-99RecompletionTal-Con, Inc.Aug 28, 1990Sep 4, 1990—7,200
331273-99RecompletionTepco EngineeringJun 8, 1987Jun 9, 1987—6,670
289313-99RecompletionTrinity Resources, Inc.Oct 24, 1985Oct 30, 1985—7,200
280941-99RecompletionTrinity Resources, Inc.Oct 29, 1985Jul 23, 1985—7,200
274692-99RecompletionTrinity Resources, Inc.May 2, 1985May 13, 1985—7,200
241976-99RecompletionTrinity Resources, Inc.Jun 13, 1984Jun 13, 1984—7,200
221258-99DrillTrinity Resources, Inc.Nov 18, 1983Nov 21, 1983Jan 11, 19847,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-7035————
—— O-2-7640————

Formation tops

As filed on W-2/G-1. Subsea from 60 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE159
Frio5,120-5,060
Vicksburg7,250-7,190

Perforations

Perforated and open-hole intervals.

FromToType
6,0766,080Perforated
6,6806,683Perforated
6,8126,815Perforated
6,8796,881Perforated
6,9806,984Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,62912.25960 S
4.57,1697.875475 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 20, 1990Nov 8, 1990Yes
00Dec 3, 1990Dec 20, 1985Yes
00Jan 20, 1986Dec 20, 1985Yes
00Jan 15, 1986——
00Aug 19, 1985Jul 8, 1985—
00Aug 7, 1985——
00Jan 8, 1985Oct 16, 1984—
00Dec 13, 1984——
00May 8, 1984Feb 27, 1984—
00Apr 7, 1984Feb 27, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23931947, documented in the API reference.