WELL · 42-239-32039 · DISTRICT 2

Miller K. R. Gas Unit No. 1 #2

Plugged

Jackson County · Toro Grande (8700 SD) field  · Directional · Sidetrack

Miller K. R. Gas Unit NO. 1 #2 (API 42-239-32039) is a plugged well in Jackson County, plugged May 5, 1995, last operated by Lower Colorado River Authority.

The RRC has issued 2 drilling permits between 1984 and 1991, permitted to 10,000 ft.

It was permitted by French Production Incorporated and has since transferred to Lower Colorado River Authority on the wellbore schedule.

Completion filings report 2 formation tops, including Vicksburg, Yegua.

Operator of record

Lower Colorado River Authority

Permitted by French Production Incorporated; the EWA schedule now lists a different operator.

Bastrop, TX · P-5 Y, filed Dec 4, 2025 · 17 permits on file · (512) 473-3200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLower Colorado River Authority
Production reportsLower Colorado River Authoritythrough Nov 1993
Latest permitFrench Production IncorporatedJun 18, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,000
total depth, ft
2
permits on file
Jun 18, 1991
last permit issued
Aug 29, 1991
completed
0
cumulative oil, bbl
111K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 1995

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 29, 1991
Shut in
—
Plugged
May 5, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Miller, K. R. Gas Unit No. 1 G-2-112266Toro Grande (8700 SD)Lower Colorado River Authority10111KJan 1993 – Apr 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lower Colorado River AuthorityMay 1993 → Nov 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
387841-99Recompletion · sidetrackFrench Production IncorporatedMay 13, 1991Jun 18, 1991Jul 1, 19919,500
238821-99DrillCities Service Oil & Gas Corp.May 14, 1984May 14, 1984May 30, 198410,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-112266————

Formation tops

As filed on W-2/G-1. Subsea from 73 ft elevation.Download CSV →

FormationMD ftSubsea
Vicksburg5,500-5,427
Yegua7,350-7,277

Perforations

Perforated and open-hole intervals.

FromToType
7,7717,783Perforated
7,8067,810Perforated
7,8067,835Perforated
8,6738,685Perforated
8,6788,687Perforated
8,7158,724Perforated
8,7228,734Perforated
8,7228,780Perforated
8,7238,733Perforated
8,7728,780Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
206024175 S
13.3753,00017.52,260 S
76,0358.75650 S
76,0359.625650 S
9.6256,37712.251,690 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 8, 1993May 4, 1993—
00Jul 8, 1987Jun 29, 1987Yes
00May 13, 1986Apr 18, 1986Yes
00Nov 6, 1985Sep 12, 1985—
00Oct 15, 1984Aug 10, 1984—
00Sep 24, 1984Aug 10, 1984—
00Sep 15, 1984Aug 10, 1984—
00Sep 15, 1984Jul 29, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23932039, documented in the API reference.