WELL · 42-239-32049 · DISTRICT 2
Schwarz Irma #1
Jackson County · LA Salle field · Vertical
Schwarz Irma #1 (API 42-239-32049) is a plugged well in Jackson County, plugged April 29, 1994, last operated by Texana Operating Company.
The RRC has issued one drilling permit, issued June 18, 1984, permitted to 5,600 ft.
It was permitted by Southwest Land & Minerals, Inc. and has since transferred to Texana Operating Company on the wellbore schedule.
Completion filings report 3 formation tops, including Miocene (undifferentiated), Catahoula, Anahuac.
Its lease has reported 19 barrels of oil and 2 mcf of gas since January 1993, last reporting in August 1994. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Southwest Land & Minerals, Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Jan 5, 2026 · 13 permits on file · (281) 444-0037
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texana Operating Company |
| Production reports | Texana Operating Companythrough Apr 1993 |
| Latest permit | Southwest Land & Minerals, Inc.Jun 18, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,600
- total depth, ft
- 1
- permits on file
- Jun 18, 1984
- last permit issued
- Aug 19, 1984
- completed
- 19
- cumulative oil, bbl
- 2
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 19, 1984
- Shut in
- —
- Plugged
- Apr 29, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Schwarz, Irma O-2-6796 | LA Salle | Texana Operating Company | 2 | 19 | 2 | Jan 1993 – Aug 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texana Operating CompanyFeb 1993 → Apr 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 242322-99 | Drill | Southwest Land & Minerals, Inc. | Jun 15, 1984 | Jun 18, 1984 | Aug 12, 1984 | 5,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-2-6796 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Miocene (undifferentiated)MIOCENE SANDS & SHALES | 1 |
| Catahoula | 4,200 |
| AnahuacANAHUAC SHELL | 4,650 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,049 | 5,051 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 309 | 12.25 | 120 S |
| 4.5 | 5,125 | 7.875 | 960 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 26, 1984 | Oct 26, 1984 | — |
| 00 | Nov 13, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-32049 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-32049 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23932049, documented in the API reference.