WELL · 42-239-32130 · DISTRICT 2

Bonnot Louise #3

Y

Jackson County · LA Ward North field · Injection  · Vertical

Bonnot Louise #3 (API 42-239-32130) is a well in Jackson County operated by Hilcorp Energy Company, completed March 29, 1995 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued November 7, 1984, permitted to 6,300 ft.

It was permitted by Crest Resources & Expl. Corp. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 189K barrels injected in the 12 months reported through May 2025.

Operator of record

Hilcorp Energy Company

Permitted by Crest Resources & Expl. Corp.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsnone
Latest permitCrest Resources & Expl. Corp.Nov 7, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,300
total depth, ft
1
permits on file
Nov 7, 1984
last permit issued
Mar 29, 1995
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 29, 1995
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bonnot, Louise O-2-6683LA Ward, NorthHilcorp Energy Company100Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
257000-99DrillCrest Resources & Expl. Corp.Nov 7, 1984Nov 7, 1984—6,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-6683————

Formation tops

As filed on W-2/G-1. Subsea from 49 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE1,920-1,871
Miocene (undifferentiated)BASE MIOCENE4,645-4,596
Frio5,186-5,137
FrioTOP FRIO5,186-5,137

Perforations

Perforated and open-hole intervals.

FromToType
1,9641,984Perforated
2,1502,184Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62598812.25445 S
8.6251,01812.25445 S
4.52,4497.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 19, 2019Jun 27, 2019—
00Jul 10, 1995May 2, 1995—
00Mar 29, 1985Mar 11, 1985—
00Mar 26, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

189K
bbl, last 12 reported months
7.37M
bbl, all reported
May 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000054878W-14 DisposalActive2,5009501,920–2,200

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 189,125 · prior 12 0

020K40K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23932130, documented in the API reference.