WELL · 42-239-32206 · DISTRICT 2
Matson #6
Jackson County · Swan Lake NE. (8900) field · Vertical
Matson #6 (API 42-239-32206) is a plugged well in Jackson County, plugged August 21, 1989, last operated by Lauritzen Energy Inc..
The RRC has issued 4 drilling permits between 1985 and 1988, permitted to 9,200 ft.
Completion filings report one formation top, including Frio.
Operator of record
Long Beach, CA · P-5 Y, filed Aug 6, 1999 · 46 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lauritzen Energy Inc. |
| Production reports | none |
| Latest permit | Lauritzen Energy, Inc.Nov 15, 1988 |
- 9,200
- total depth, ft
- 4
- permits on file
- Nov 15, 1988
- last permit issued
- Jul 7, 1985
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 7, 1985
- Shut in
- —
- Plugged
- Aug 21, 1989
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 353228-99 | Recompletion | Lauritzen Energy, Inc. | Nov 14, 1988 | Nov 15, 1988 | — | 9,112 |
| 303659-99 | Recompletion | Lauritzen Energy, Inc. | Jun 27, 1986 | Jun 30, 1986 | — | 9,112 |
| 282093-99 | Recompletion | Lauritzen Energy, Inc. | Aug 8, 1985 | Aug 8, 1985 | — | 9,200 |
| 275738-99 | Drill | Lauritzen Energy, Inc. | May 22, 1985 | May 22, 1985 | — | 9,200 |
Formation tops
As filed on W-2/G-1. Subsea from 24 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Frio | 6,100 | -6,076 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,684 | 8,694 | Perforated |
| 8,848 | 8,861 | Perforated |
| 8,920 | 8,928 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,126 | 13.5 | 550 S |
| 4.5 | 9,115 | 8.75 | 800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 2, 1986 | Aug 14, 1986 | Yes |
| 00 | Aug 22, 1986 | — | — |
| 00 | Oct 31, 1985 | Aug 19, 1985 | — |
| 00 | Oct 23, 1985 | — | — |
| 00 | Aug 26, 1985 | Aug 1, 1985 | — |
| 00 | Aug 13, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-32206 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-32206 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23932206, documented in the API reference.