WELL · 42-239-32240 · DISTRICT 2
Allen William E. #1
Jackson County · Cordele East (3200 Catahoula) field · Vertical
Allen William E. #1 (API 42-239-32240) is a plugged well in Jackson County, plugged January 9, 1987, last operated by Mitchell Energy Corporation.
The RRC has issued 2 drilling permits between 1985 and 1988, permitted to 4,000 ft.
It was permitted by Evergreen Oil & Gas and has since transferred to Mitchell Energy Corporation on the wellbore schedule.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Catahoula.
Operator of record
Permitted by Evergreen Oil & Gas; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed May 5, 2000 · 4,224 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mitchell Energy Corporation |
| Production reports | Evergreen Oil & Gasthrough May 1993 |
| Latest permit | Evergreen Oil & GasJun 21, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 2
- permits on file
- Jun 21, 1988
- last permit issued
- Nov 8, 1985
- completed
- 0
- cumulative oil, bbl
- 6.94K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 1993
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 8, 1985
- Shut in
- —
- Plugged
- Jan 9, 1987
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Allen, William E. G-2-128037 | Cordele, East (3200 Catahoula) | Evergreen Oil & Gas | 1 | 0 | 6.94K | Jan 1993 – Dec 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Evergreen Oil & GasJan 1993 → May 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 348008-99 | Reenter | Evergreen Oil & Gas | Jun 20, 1988 | Jun 21, 1988 | — | 3,516 |
| 288432-99 | Drill | Mitchell Energy Corporation | Oct 25, 1985 | Oct 25, 1985 | — | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-128037 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 87 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE 2700' SAND | 2,730 | -2,643 |
| Catahoula | 3,230 | -3,143 |
| CatahoulaCATAHOULA SAND | 3,230 | -3,143 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,231 | 3,233 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 425 | 13.5 | 400 S |
| 4.5 | 3,516 | 7.875 | 810 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 19, 1988 | Aug 1, 1988 | Yes |
| 00 | Aug 18, 1988 | — | — |
| 00 | Feb 3, 1986 | Dec 23, 1985 | Yes |
| 00 | Jan 23, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-32240 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-32240 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23932240, documented in the API reference.