WELL · 42-239-32300 · DISTRICT 2
Webernick G.U. #1
Jackson County · Vertical
Webernick G.U. #1 (API 42-239-32300) is a permitted well in Jackson County filed by Allegro Investments, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1986 and 1997, permitted to 16,000 ft.
Completion filings report 7 formation tops, including Frio, Vicksburg, Yegua, Cook Mountain.
Operator of record
Victoria, TX · P-5 Y, filed Oct 2, 2020 · 298 permits on file · (361) 573-5619
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Ffa Petroleum Services, Inc.through Jul 2014 |
| Latest permit | Allegro Investments, Inc.Oct 24, 1997 |
- 16,000
- total depth, ft
- 2
- permits on file
- Oct 24, 1997
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 767K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Webernick G.U. G-2-124054 | Brushy Creek (Wilcox Cons.) | Petro-Smith Operating LLC | 1 | 0 | 767K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Ffa Petroleum ServicesJan 1993 → Sep 2001
- 2Allegro Investments, Inc.Oct 1997 → May 1998
- 3Ffa Petroleum Services, Inc.Oct 2001 → Jul 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 469211-99 | Recompletion | Allegro Investments, Inc. | Oct 24, 1997 | Oct 24, 1997 | — | 16,000 |
| 304521-99 | Drill | Conoco Inc. | Jul 23, 1986 | Jul 24, 1986 | — | 16,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-124054 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 114 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Frio | 3,260 | -3,146 |
| Vicksburg | 4,558 | -4,444 |
| Yegua | 6,168 | -6,054 |
| Cook Mountain | 7,638 | -7,524 |
| Queen City | 8,458 | -8,344 |
| Carrizo | 9,248 | -9,134 |
| Wilcox | 9,888 | -9,774 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,036 | 11,042 | Perforated |
| 11,046 | 11,064 | Perforated |
| 11,076 | 11,084 | Perforated |
| 11,088 | 11,099 | Perforated |
| 11,108 | 11,114 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 1,394 | 30 | 3,675 S |
| 13.375 | 4,806 | 17.5 | 2,950 S |
| 9.625 | 10,029 | 12.25 | 1,000 S |
| 7 | 13,032 | 8.5 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 5, 1987 | Mar 27, 1987 | Yes |
| 00 | May 28, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-32300 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-32300 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23932300, documented in the API reference.